Month Reference list Country Plant                      
October 2024 Repair and manufacturing of bearings for a MAN MARC 2 B00 8500 Kw turbine Spain Paper                      
October 2024 Production of spare parts for a MAN MARC 2 B00 8500 Kw turbine Spain Paper                      
October 2024 Major revision and production of spare parts for a Triveni STST-160-EB-039 4Mw steam turbine Sweden Energy                      
October 2024 Inspection and update of the control system of a KKK Twin CKR3/AFA6 GTA steamturbine Greece Waste                      
October 2024 Steampath & gearbox inspection steamturbine Thermodyn 821 8,5 Mw France Chemical                      
October 2024 Trouble shooting&Major overhaul KKK Twin AFA 4/6 steam turbine Germany Energy                      
October 2024 Reblading and repair of a rotor ABB G25 Steam turbine 12 Mw Spain Sugar                      
October 2024 Reverse engineering capital spare parts of a Demag VK 16-6 C01 compressor France Air separation                      
October 2024 Inspection stop valve MAN MARC2 and AEG-LAMOS G20 Sweden Waste                      
October 2024 Repair bearings of a siemens T6213 NK50/63/212 26 Mw Spain Paper                      
October 2024 Replacement generation protection Radial steam Ljungström turbine 13 mW Germany Metalurgy                      
October 2024 No stop check, inspection and repair of bearing MAN MARC 2-H01 Austria Energy                      
October 2024 Inspection and modification IGV Atlas Copco H9-7-502 MAC Poland Air separation                      
October 2024 Spindle replacement of Siemens 8377 NG 50/40-3 20750 kW steam turbine Spain Paper                      
October 2024 Troubleshooting & bearing manufacturing Steam compressor Rateau TSD65/655XA Swiss Air separation                      
September 2024 Production of spareparts for system turbine ACEC 6200 kW Sweden Chemical                      
September 2024 No stop check for a Man Marc 4-H01 11700 kW steam turbine Germany Energie                      
September 2024 Revision Feed water turbine Germany Metalurgie                      
September 2024 Shaft seal repair of a Fincanteri 36 CE 7280 kW Sweden Energy                      
September 2024 Repair landing x6 Trx mechanical turbo FCB France Sugar                      
September 2024 Temperature measurement in Upper en Lower part of Brown Boveri Turbine Spain Sugar                      
September 2024 Inspection Compander Cryostar TC7600 Plug in Italy Chemical                      
September 2024 Insection impellers Linde IGC E53618 MAC Germany Chemical                      
September 2024 IGV overhaul and exchange Belgium Chemical                      
August 2024 Renewal of regulating valve seals of a Man Marc 2 H01 Czech republic Papermill                      
August 2024 Calibration of axial sensors of Man Turbo Marc 2 Sweden Waste                      
August 2024 Minor overhaul of a Demag VK32,3 MAC Italy Chemical                      
August 2024 Bearing inspection and production of spare parts for an Alsthom Rateau MAC Swiss Chemical                      
August 2024 Steam path and valve inspection of a Man Marc 2 steam turbine Belgium Papermill                      
August 2024 Minor overhaul of a Man Marc 2 steam turbine Germany Food                      
August 2024 Inspection regulating valves KKK steam turbine Luxembourg Energy                      
July 2024 Repair of bearings and seals strips of a Brown Boveri AAB G25 12,8 mW steamturbine Spain Sugar                      
July 2024 Total reblading of a Brown Boveri 12,8 MW steamturbine Spain Sugar                      
July 2024 RCA cracks Impeller co2 Compressor Atlas Copco GT021T3D0/021 T1D0 Germany Chemical                      
July 2024 Gearbox inspection Atlas Copco Air Compressor C01/C02 Germany Air separation                      
July 2024 Inspection of an Escher Wyss BBC 90/4a EK compressor Swiss Saltmine                      
June 2024 Reverse engineering and datacollecting of a MAC RC-0501 compressor Belgium Chemical                      
June 2024 Minor overhaul Thermodyn 821 8.5 Mw steam turbine France Chemical                      
June 2024 Inspection and repair of bearings of a CVK32-3 MAC1 Turbo Compressor Italy Chemical                      
June 2024 No stop check and gear inspection of a Siemens SST-110 3037kW steam turbine Sweden Power                      
June 2024 Diagnostic trouble shooting of a Siemens S.N. T5803 steam turbine Italy Chemical                      
June 2024 Manufactuaring a new actuator for an ABB AEG Kanis G20 SSV steamturbine Belgium Paper & pulp                      
June 2024 Manufacttuaring for a Man Marc 2 steam turbine Sweden Waste                      
June 2024 Inspection, modification and installation of an IGV of an Atlas Copco Sir compressor Air seperation Germany                      
June 2024 Rotor inspection of a Siemens KKK 4V compressor Belgium Chemical                      
June 2024 Inspection of a Siemens SST-600 steam turbine 25000kW Sweden Power                      
June 2024 No stop check of two Atlas Copco Turbo Compressors Type GTO40N3K1 Italy Chemical                      
June 2024 Inspection and repair of bearings of an Atlas Copco Nitrogen Turbo compressor Poland Chemical                      
June 2024 EMD generator Leroy Somer 9100kva Sweden Power                      
June 2024 No stop check on a Siemens KKK Twin steamturbine Luxemburg Power                      
June 2024 Inspection of the bearing of a Siemens STT600 steamturbine Netherlands Power                      
June 2024 Inspection of a stop valve of a Siemens SST100 AFA66 steamturbine Austria Paper & pulp                      
June 2024 Repair of a stop valve of a Shinko 3500 kw steamturbine Sweden Power                      
June 2024 Inspection of bearings of a AEG Kanis G20 9445 kW steamturbine Belgium Paper & pulp                      
June 2024 EMD check of a WEG SPW 800 generator Sweden Power                      
June 2024 Inspection of a regulation valve of a Woodward MAN Marc 2 Spain Power                      
June 2024 Troubleshooting of a Siemens SST-110 3037 kW steamturbine Sweden Power                      
May 2024 Reblaiding of a Brown Boveri G25A 11MW steam turbine Spain Sugar factory                      
May 2024 Repair of bearing Brown Boveri G25A 11MW steam turbine Spain Sugar factory                      
May 2024 Upgrade of the control system of a Brown Boveri G25A 11MW steam turbine Spain Sugar factory                      
May 2024 PLC cards and instruments for a Brown Boveri G25A 11MW steam turbine Spain Sugar factory                      
May 2024 Production of spare parts for a RMV Rateau SM67-55 compressor France Chemical                      
May 2024 Overhaul and workshop testing actuators of a KKK CA56 twin steam turbine Belgium Waste                      
May 2024 Inspection and repair of bearing FCB 55 CP Fuve Lillers France Sugar factory                      
May 2024 Inspection of Demag N2 Feedgas compressor Belgium Chemical                      
May 2024 Troubleshooting stopvalve Steam Leakage of a AAB AEG Kanis G20 steam turbine Belgium Paper & pulp                      
May 2024 Inspection of bearing Siemens STT600 steam turbine Netherlands Biomass energy                      
April 2024 Trouble shooting feed water turbine KKK cf 5GS Sweden Paper & pulp                      
April 2024 Production spare Parts RMV Rateau SM67-55 compressor France Chemical                      
April 2024 Annual check of a steam turbine end gearbox MAN Marc2 B00 Spain Paper & pulp                      
April 2024 Non stop check and gear inspection of a Siemens SST-110 3037 kW steamturbine Sweden Paper & pulp                      
April 2024 Non stop check on a Triveni STST-1060-EB-039 4MW steamturbine Sweden Power                      
April 2024 Bearing inspection Siemens motor and MAN RIK compressor France Air separation                      
April 2024 Non stop check FRC 1 - FRC 2 - MAC Atlas Copco compressors Poland Chemical                      
March 2024 Manufacturing of coupling on a Man Marc 8.5 mW steamturbine Spain Paper & pulp                      
March 2024 Revsion an delivery of spare parts of a Terry turbine T-38233-I (GA) BHP 210 2970 rpm Belgium Oil                      
March 2024 Revision speisewasserturbine D1 KKK AF 4G Germany Metalurgy                      
March 2024 Repair of bearings on a Man turbo compressor RG050/03/02 Italy Chemical                      
March 2024 Major inspection Air Compressor Demag CVK 10-3 Italy Chemical                      
March 2024 Inspection RMV Rateau SM55 / 67 France Air separation                      
March 2024 Bearing inspection and production of spare parts C01/GEC Alsthom Italy Air separation                      
March 2024 Oil pump test on aPBS R14-A0 14000 kW steam turbine Sweden Biomass Energy                      
March 2024 Inspection of bearings on a MAN Sika 2 turbo compressor Italy Air separation                      
March 2024 Non stop check on a Siemens STT-600 25000 kW steam turbine Sweden Biomass Energy                      
February 2024 Production of gearset Atlas Copco C60/C61 GT040 N2K2/GT 050 N4K1 compressor France Air seperation                      
February 2024 Coupling, installation of bearing, aligment and start up support of a Brown Boveri ABBG25 12,8 MwTurbine Spain Sugar factory                      
February 2024 Major Overhaul of a Rateau compressor CM2.80-3 France Chemical                      
February 2024 Major overhaul of a Rateau turbine 17022 CP11 France Chemical                      
February 2024 Major overhaul of a Flender reducer NH20 France Chemical                      
February 2024 Inspection of steam turbine ABB G 25 A 11Mw Spain Sugar factory                      
February 2024 Production of bearing pads for steam turbine ABB G 25 A 11Mw Spain Sugar factory                      
February 2024 Inspection of a stopvalve Alsthom turbine 6000KVA France Chemical                      
February 2024 Reverse engineering of 6 compressor impellers Turkey Metalurgy                      
January 2024 Overhaul MAN Turbo MAC 2 H02 8370 KW Sweden Power                      
January 2024 Revamp regulating system BRNO-CSFR Skoda Turbine R14-AO 14 Mw Sweden Power                      
January 2024 Minor Inspection and production of spare parts Brown Boveri ABBG25 turbine 12,8 MW Spain Sugar factory                      
January 2024 New electronic antisurge system and pressure control system of Demag air compressor type VK16 Spain Power                      
January 2024 Reblaiding and repair Brown Boveri G25A 11MW steam surbine Spain Sugar factory                      
January 2024 Inspection AC Feed/recycle nitrogen compressor GT040N4 K1 Italy Air Separation                      
January 2024 Major overhaul Siemens generator 1DU1532-8AF02-Z 7155KVA Sweden Biomass Energy                      
January 2024 Repair axial bearing steam turbine MAN MARC 2 10 MW Germany Biomass Energy                      
January 2024 Repair Renk babbitt bearing Fläkt Woods turbo fan KEXrk-85/1580-xx-H-RD0 Sweden Biorefinery                      
January 2024 Manufacturing components actuator stop valve MAN MARC2 B00 8.5Mw Spain Paper & Pulp                      
January 2024 Inspection & repair TC 30 reciprocating driver 800b embiellage pompe ACD France Air Separation                      
January 2024 NSC steam turbine ABB G25 A 11MW Spain Sugar factory                      
January 2024 Minor Overhaul steam turbine BRNO-CSFR (PBS Skoda) R14-A0 14MW Sweden Power                      
December 2023 Major overhaul Steam Turbine G3 STAL DAMK 75 36200kW Sweden Power                      
December 2023 Revision Turbine ACEC M2209.S 6,2Mw Sweden Chemical                      
December 2023 Modification bearings nitrogen compressor HVK 10-6 Demag Siemens Italy Air Separation                      
November 2023 Removal of oil and vapour leaks Steam Turbine Ljungstrom 13Mw Germany Metalurgy                      
November 2023 Inspection & repair Compressor BBC TK111/4G Escher Wyss Sulzer Suisse Salt Mine                      
November 2023 NSC Steam Turbine Siemens T8424 Spain Sugar Factory                      
November 2023 NSC Steam Turbine ABB G25A 11MW Spain Sugar Factory                      
November 2023 Hot Alignment & Overspeed Tests Steam Turbine MAN MARC 2 B00 BHS Cincinnati RTP 56II Spain Paper & Pulp                      
November 2023 Oil Change Steam Turbine Shinko DNG62B-65 3,65Mw Sweden Power                      
November 2023 Tuning regeling of Steam Turbine Turbin Fincantieri 36CE 7,28Mw Sweden Power                      
November 2023 NSC + Stor Generator Revision Steam Turbine Siemens SGEN 5-100A-4P Sweden Paper & Pulp                      
November 2023 Delivery of speedsensor TAS203 for Steam Turbine MAN Turbo MAC 2 H02 8370 KW Sweden Power                      
November 2023 Minor Inspection, delivery of spare parts, Reverse engineering, data collecting, Overhaul IGV for MAC Atlas Copco GT123L4K1Compressor Belgium Air Separation                      
November 2023 Minor Inspection, delivery of spare parts, Reverse engineering, data collecting, Overhaul IGV for MNC Compressor Samsung/Hanwha SE-45N Belgium Air Separation                      
November 2023 Minor Inspection, delivery of spare parts, Reverse engineering, data collecting, Overhaul IGV for BAC Praxair Compressor Belgium Air Separation                      
November 2023 Anual check Steam Turbine & gearbox MAN MARC 2 B00 BHS Cincinnati RTP 56II Spain Paper & Pulp                      
November 2023 Inspection Turbine bearing Steam Turbine Siemens G T4532 Germany Chemical                      
November 2023 Troubleshooting regulation valve Steam Turbine ABB AEG Kanis G20 9,445MW Belgium Paper & Pulp                      
October 2023 Woodward control system of Steam Turbine Brown Boveri BBC G25A 12,8Mw Spain Sugar Factory                      
October 2023 Turbine Inspection Steam Turbine MAN Turbo MARC 2 C01 7,795Mw Sweden Waste                      
October 2023 Photogrammetry Steam Turbine MAN Turbo MARC 2 C01 7,795Mw Sweden Waste                      
September 2023 Reconstruction control valves Steam Turbine ACECE M2209.S 6,2Mw Sweden Chemical                      
September 2023 NSC & Revision Turbine & Generator inspection DE-LAVAL Radialturbine DDM55 5Mw Denmark Food                      
September 2023 Replacement of actuators Steam Turbine Fincantieri 36CE 7,28Mw Sweden Power                      
September 2023 Repair actuators HP/LP Steam Turbine Fincantieri 36CE 7,28Mw Sweden Power                      
September 2023 NSC + limited revision Steam Turbine ABB STAL-WAX HP25 29,2Mw Sweden Paper & Pulp                      
September 2023 Reverse engineering of reciprocating Compressor TC30 France Chemical                      
September 2023 Minor Overhaul Steam Turbine MAN Turbo MAC 2 H02 8370 kW Sweden Power                      
September 2023 Delivery of Piedzo Vibration Sensor for Steam Turbine MAN Turbo MAC 2 H02 8370 kW Sweden Power                      
September 2023 Bearing clearance, instalation & start up support Steam Turbine ABB G25A 11Mw Spain Sugar Factory                      
September 2023 Inspection & repair of bearing 5° STD MAN Compressor CO1 Italy Chemical                      
September 2023 Troubleshooting Steam Turbine MAN MARC 2 C11 Germany Power                      
September 2023 Videoscopy & repair of stopvalve actuator Steam Turbine Siemens SST-600 24Mw Sweden Power                      
September 2023 Repair of generator bearings Kaplan Hydro Turbine Spain Hydro                      
September 2023 Troubleshooting Oilleakage bearing NDE Steam Turbine ABB AEG Kanis G20 9,445Mw Belgium Paper & Pulp                      
August 2023 Redesign study & 2D Production Drawings Air Compressor Demag MAC CVK 32-3 Italy Air Separation                      
August 2023 Revamp of compressor & manufacturing of gas flow paths Air compressor Demag MAC CVK 32-3 Italy Air Separation                      
August 2023 Repair of generator rotor Siemens-Schukert Lj60/2a FT13 13Mw Germany Steal Industry                      
August 2023 Replace oilpump Steam Turbine Siemens SST600 25Mw Sweden Power                      
August 2023 Valve repair Steam Turbine Siemens SST600 25Mw Sweden Power                      
August 2023 Inspection & upgrade controle system Steam Turbine Siemens KKK SST 110 CFR3 AFA GTA Greece Waste                      
August 2023 Major Overhaul & delivery of spare parts Steam Turbine Brown Boveri BBC G25A 12,8Mw Spain Sugar Factory                      
August 2023 Maintenance & delivery of spare parts MAN MARC 2C10 5,72Mw Belgium Biomass                      
August 2023 Inspection & boroscopy & photogrammetry of Steam Turbine MAN MARC 2H01 Austria Power                      
August 2023 Delivery of axial sensors MAN MARC C02 7795 Kw Sweden Waste                      
August 2023 Delivery of speed sensor for Steam Turbine Siemens SST 110 AFA66 Austria Paper & Pulp                      
August 2023 Inspection HP stage RMV SM55/67 CO Compressor Rateau Alsthom France Chemical                      
August 2023 Bearing inspection MAN MARC 4 H01 Austria Power                      
July 2023 Reverse engineering Compressor VK200 Demag Siemens Nitrogen compressor France Chemical                      
July 2023 Boroscope inspection Steam Turbine MAN MARC 2H01 4Mw Czech Republic Wood                      
July 2023 Delivery & replacement of spare parts Steam Turbine MAN MARC 2H01 4Mw Czech Republic Wood                      
July 2023 EMD Measurement of Generator Leroy Somer A56 BMDL 145-4P 9100 kVA Sweden Power                      
July 2023 Adjustment speed regulator Feed Water Turbine KKK CF5 GS 1280kW Sweden Paper & Pulp                      
July 2023 Boroscope inspection Atlas Copco Feedgas & Recycle compressor GT040N4K1/023N2K1 Italy Air Separation                      
July 2023 Bearing inspection Steam Turbine Siemens T8440 Netherlands Waste                      
June 2023 Compressor Inspection KKK 4V SF0 Belgium Materials Recycling                      
June 2023 Inspection parts + repair of Turbo Compressor KKK SFMG Austria Wood                      
June 2023 Delivery of Digital Indicator & Speedsensor Steam Turbine G25A 12,8Mw BBC Spain Sugar Factory                      
June 2023 Oil works on Steam Turbine WTE 1 AEG Kanis GE20 2Mw Sweden Waste                      
June 2023 Overhaul with installation of 2 control valve spindles Steam Turbine MAN MARC 4-H01 11,7Mw Austria Power                      
June 2023 Inspection of turbine by endoscopy & photogrammetry Steam Turbine MAN MARC 4-H01 11,7Mw Austria Power                      
June 2023 Troubleshooting Steam Turbine Siemens SST-110 3,037Mw Sweden Power                      
June 2023 Manufacturing of pinion for Steam Turbine SST-110 3,037Mw Sweden Power                      
June 2023 Inspection & repair of Turbo Alternator FCB 55CP Five Lillers France Sugar Factory                      
June 2023 Delivery of axiale turbine pads for Turbo Alternator FCB 55CP France Sugar Factory                      
June 2023 Tilting blocks & pads for Steam Turbine MAN MARC1 Austria Power                      
June 2023 Troubleshooting control valve Steam Turbine Siemens SST110 AFA66 Austria Paper & Pulp                      
June 2023 Oilworks on Steam Turbine Triveni TST-1060-EB039 3,896Mw Sweden Power                      
June 2023 Delivery of C-seal for KKK-Twin CFR5 AFA 6 5,385Mw Belgium Waste                      
June 2023 Troubleshooting oilleakage Steam Turbine Brown Boveri BBC DEF ZI 43 26,8 Mw Netherlands Waste                      
June 2023 Troubleshooting speed pick up turbine & replacement speed sensor for Steam Turbine MAN MARC 2H01 8Mw Belgium Biomass                      
May 2023 Lubricating oil change steam turbine MAN Turbo Marc 2 C01 5MW Sweden Waste                      
May 2023 Inspection of thrust & axial bearing Turbo Alternator TA4 Thermodyn 821 France Chemical                      
May 2023 Maintenance Turbine compressor Escher Wyss ER80340 type R28 Suisse Salt Mine                      
May 2023 NSC & Boroscope inspection of Steam Turbine MAN MARC 2H01 4Mw Czech Republic Wood                      
May 2023 Total Reblading Steam Turbine G25A 12,8Mw BBC Spain Sugar Factory                      
May 2023 Mechanical Inspection gearbox & generator Steam Turbine G25A 12,8Mw BBC Spain Sugar Factory                      
May 2023 Minor Overhaul Steam Turbine WTE1 AEG Kanis GE20 2Mw Sweden Waste                      
May 2023 Repair of plunjer Steam Turbine WTE1 AEG Kanis GE20 2Mw Sweden Waste                      
May 2023 Lubricating oil change steam turbine MAN Turbo Marc 2 C01 5MW Sweden Waste                      
May 2023 Delivery of extra cartridge filter steam turbine MAN Turbo Marc 2 C01 5MW Sweden Waste                      
May 2023 Renewing of steam seals & delivery of studs Steam Turbine MAN MARC 2-H01 Austria Power                      
May 2023 Major Overhaul + start up Steam Turbine BBC G25 12,8Mw Spain Sugar Factory                      
May 2023 NSC + maintenance KKK Twin CA56 5,385Mw Belgium Waste                      
May 2023 Troubleshooting Feed water Turbine KKK CF 5 GS 1,280Mw Sweden Paper & Pulp                      
April 2023 Inspection 2 Tilting Pad bearings B210 & B220 Flender gearbox of the MAN RIK 125-3 compressor Italy Chemical                      
April 2023 Small Revision steam turbine KKK Typ AF 3,5 Gs Germany Oil Refinery                      
April 2023 Functional test & overspeed test + packaging turbine & spare parts KKK Dampfturbine Typ AF 3,5 Gs Germany Oil Refinery                      
April 2023 NSC steam turbine Triveni TST-1060-EB-039 3896 kW Sweden Power                      
April 2023 Delivery of Raw materials blades BLNC 2 Compressor Germany Air separtaion                      
April 2023 NSC of Steam Turbines AEG-Kanis GE20 2000kW and MAN Turbo Marc 2 C-01 7795 kW Sweden Waste                      
April 2023 EMD measurement generators AEG Rotaduct and ELIN Motoren Sweden Waste                      
April 2023 Trouble shooting SP5 feedwater turbine KKK CF5Gs 1300kW Sweden Paper & Pulp                      
April 2023 Adjustment Oilpump BLNC compressor Belgium Air separtaion                      
April 2023 NSC of steam turbine Fincantieri 36CE 7280 kW Sweden Power                      
April 2023 Works on condensor en lager turbine Franco Tosi Netherlands Waste                      
April 2023 Renovation & inspection of axial bearing steam turbine MAN Marc 2 C01 5MW Sweden Waste                      
March 2023 Machining of generator shafts + repair bearings, control valve spindle, cracks control valve + Gaskets & smaller materials DE-LAVAL DDM55 radial turbine Denmark Food Industry                      
March 2023 Hot Alignment & Overspeed Tests steam turbine MAN Marc2 B00 8,5MW Spain Paper                      
March 2023 Delivery of spare parts FGRC-Borsig GK636 compressor Germany Air separtaion                      
March 2023 Revision Steam turbine & generator inspection of steam turbine Siemens SST 110 AFA66 Austria Paper                      
March 2023 Delivery of Shaft earthing brush for steam turbine Siemens SST-600 25MW Sweden Power                      
March 2023 Manufacturing of 2 spindles for steam turbine MAN MARC4-H01 Austria Power                      
March 2023 Adjustment Probe BLNC 1 compressor Germany Air separtaion                      
February 2023 RE, production and installation of bearings of steam turbine Siemens SST 110 3037 Kw Sweden Power                      
February 2023 NSC + Pre-study Performance + Revision + Generator inspection DE-LAVAL DDM55 radial turbine Denmark Food Industry                      
February 2023 Manufacturing and repair Gears Set of the Gearbox BHS Voith AD 71 HSO gas turbine Spain Power                      
February 2023 Manufacturing of oil labyrinth seal (pinion) BHS Voith AD 71 HSO gas turbine Spain Power                      
February 2023 Inspection of gearbox of steam turbine Allen GTA 4,5MW France Sugar                      
February 2023 Production of capital spare parts VK36 C01 compressor France Chemical                      
February 2023 Repair of axial bearing steam turbine MAN Marc2 H01 8Mw Netherlands Biomass Energy                      
February 2023 Deliivery of sensor BTL7-A510-M0150- K-K02 for steam turbine MAN Marc 2-C10 5MW Austria Biomass Energy                      
February 2023 Refurbishing pinion 1&2 Atlas Copco GT021T3 DO/021 T1DO compressor Germany Air separtaion                      
February 2023 NSC steam turbine PBS R14-A0 14kW Sweden Power                      
February 2023 Rotor inspection steam turbine ABB G25A 1MW Spain Sugar                      
February 2023 Disassembly of bottom half turbine of steam turbine ABB G25A 1MW Spain Sugar                      
February 2023 Delivery of New filter kit for the oil demister Franke FF Sweden Power                      
February 2023 NSC Steam Turbine ACEC M2209.S 6200kW Sweden Chemical                      
January 2023 Troubleshooting steamlekkeage & oilsystem on control valve Avk Generator DIG 150k4 4536 kVA Sweden Power                      
January 2023 Works oilsystem steam turbine C Brown Boveri DEF ZI 43 Netherlands Waste                      
January 2023 Bearing repair of steam turbine ABB STAL VAX HP25 Sweden Paper                      
January 2023 Delivery of spare parts & installation steam turbine ABB STAL VAX HP25 29 200 kW Sweden Paper                      
January 2023 Bearing repair FläktWoods fan KeXrk-85/1580-xx-H-RDO Sweden Biorefinery                      
January 2023 Rotor Inspection St 3-4 C51 Siemens Demag Belgium Industrial gas                      
January 2023 Maintenance /Inspection to solve high vibrations on 3 /4 Stages Demag Nitrogen Turbo Compressor Type HVK10-6 Italy Air separtaion                      
January 2023 Troubleshooting steamleakage steam turbine Siemens SST 600 27,2MW Sweden Power                      
January 2023 NSC steam turbin Siemens SST-600 25000 kW Sweden Power                      
January 2023 Troubleshooting stopvalve of steam turbine SHINKO DNG 62B-65 3,65MW Sweden Power                      
December 2022 Inspection stopvalve & actuator of steam turbine MAN Marc 2-B00 8,5 MW Spain Paper                      
December 2022 Inspection intake valve of the 2nd extraction control body of steam turbine T5318 SIEMENS EK1100-2 Portugal Paper & Pulp                      
December 2022 Start up of steam turbine KKK AGAGT44GTA 2300 kW Sweden Paper                      
December 2022 Borescope inspection of steam turbine AEG Kanis GE20 2000kW Sweden Waste                      
December 2022 Milling of 2-inch clamp and 4-inch clamp Belgium Metalurgy                      
December 2022 Datacollecting 3D & 2D scanning & reverse enigneering of CO2 compressor Atlas Copco GT021L3K1   France Chemical                      
December 2022 Delivery of spare parts for compressor FGRC-Borsig GK637 Germany Air separation                      
December 2022 Delivery of spare parts for steam turbine Triveni TST-1060-EB039 Sweden Power                      
December 2022 Repair of bearings, production of seals & inspection of valves of steam turbine Turbine C Brown Boveri DEF ZI 44 Netherlands Waste                      
December 2022 Service contract agreement for steam turbine KKK CFR3/AFA6 2,64MW Germany Chemical                      
December 2022 Refurbishment, reverse engineering Gearset RG40-4 MAN Compressor Belgium Chemical                      
December 2022 Troubleshooting of steam turbine Fincantieri CE 36 7280 kW Sweden Power                      
December 2022 Inspection & vibration analysis of Turbo Alternator Ahlsthom RV 144.87 6000KVA France Chemical                      
December 2022 Delivery of valve gasketset for steam turbine MAN Marc2 B00 BHS- Cincinnati -RTP 56 II Spain Paper                      
December 2022 Repair of generator rotor of steam turbine Siemens-Schuckert Lj60/2a FT 13 Germany Steal                      
December 2022 Troubleshooting oilleakage of steam turbine Turbin KK&K CF5 GS SP5 Sweden Paper & Pulp                      
November 2022 NSC on steam turbine siemens NK40-5906 Spain Chemical                      
November 2022 Creating 2D & 3D drawings of impellers Gardner Denver 4207 Belgium Metalurgy                      
November 2022 Inspection of control valve & revison of hydraulic system of BEC turbine Franco Tosi Netherlands Waste                      
November 2022 Machining operations of segmentrings Belgium Metalurgy                      
November 2022 Start up assistance for steam turbine SHINKO DNG62B-65 Sweden Paper                      
November 2022 Manufacturing capital spare parts/gear set for Nitrogen compressor C60/C61 GT 040 N2K2/GT 050 N4K1 Atlas Copco France Chemical                      
  November 2022 Delivery of spare kit for TCV 4-13 Fincantieri Condensing 9Mw Sweden Power                      
November 2022 Annual inspection, manufacturing & installation of new valve guiding spindles for steam turbine MAN Marc 2-B00 8,5 MW Spain Paper                      
  October 2022 Boroscope inspection & inspection of sliding plates on steam turbine KVV2 TURBO MAN MARC 2-H02 8730kW Sweden Power                      
October 2022 Standard overhaul servomotor on steam turbine MAN MARC 2 C10 5,72MW Belgium Biomass                      
October 2022 Generator assistance for steam turbine ELIN HTM 180-D04 10913 kVa Sweden Power                      
October 2022 Service trip block & start up of steam turbine Siemens P3 SST-600 Sweden Power                      
  October 2022 Machining of bearings & inspection & test turbo movement on steam turbine ABB G25A 11MW Spain Sugar                      
October 2022 Assembly & prepare for operation of steam turbine Siemens SST 300 Turkey Power                      
  October 2022 NSC on steam turbine KKK Twin C AFA CFR 2,4MW Austria Biomass                      
October 2022 NSC on steam turbine Ljungstrom 13MW Germany Metalurgy                      
  October 2022 RE & IG C550- Siemens Demag V41 & data collecting & scanning 3D & 2D Belgium Chemical                      
October 2022 Voltage regulator replacement on Generator Leroy Somer A56 BMDL145 9 100 kVA Sweden Power                      
  October 2022 High speed pinion bearing on Turbo Alternator FCB 55CP Five Lillers France Sugar                      
October 2022 Delivery of packing, overhaul valves & inspection, machine adjustment, repair of bearings of steam turbine KKK AGAGT44GTA 2300 kW Sweden Paper                      
  October 2022 On site support LINDE CRYOGENIC expansion turbine L France Chemical                      
October 2022 Repair of bearing on steam turbine Stal Laval no B2183 France Paper                      
  October 2022 Delivery & replacement of seal on steam turbine PBS R14-A0 14 000 kW Sweden Power                      
October 2022 Delivery & replacement of seal on steam turbine ABB STAL VAX HP25 29 200 kW Sweden Paper                      
  October 2022 Full rotor inspection & assembly of Vacuum Blower RC 4a-4N-80 Sulzer Poland Pulp & paper                      
October 2022 Inspection of N2FG Compressor TC5 + TC6 GHH Borsig nitrogen en feedgas compressor Belgium Chemical                      
  September 2022 Data collecting & scanning gearset & impellers , glass pearl blasting of VK36 Demag Siemens Main air compressor France Chemical                      
September 2022 Delivery of sensor displacement for steam turbine Siemens STT300 GE40A 28.3MW Sweden Pulp                      
  September 2022 Trouble shooting of oil system, for steam turbine Siemens P3 SST-600 Sweden Power                      
September 2022 Trouble shooting for steam turbine Triveni TST-1060-EB039 Sweden Power                      
  September 2022 Inspection of steam turbine ABB STAL VAX HP25 29200kW Sweden Paper                      
September 2022 Radial & axial bearing, replacement of spare parts & control loop check on steam turbine MAN MARC 2 H01 8MW Belgium Biomass                      
  September 2022 EMD measurement on generator ABB HSG 710XS4 Sweden Chemical                      
September 2022 Control care servo callibration of steam turbine ABB G25A 11MW Spain Sugar                      
  September 2022 Stop valve steam leakage and oil overflow valve & service tripblock & manufacture and replace valves of steam turbine Siemens SST-600 25MW Sweden Power                      
September 2022 Revision of generator AvK DIG 150k4 4536 kVA Sweden Power                      
  September 2022 Minor Overhaul Steam turbine Shinko DNG62B-65 Sweden Power                      
September 2022 New parts & repair of bearing/shaft of steam turbine Shinko DNG62B-65 Sweden Power                      
  August 2022 NSC, supply of VOITH servomotor, standard overhaul & generator check on steam turbine MAN MARC2-C10 Belgium Biomass                      
August 2022 Troubleshooting start sequence of steam turbine PBS R14-A0 1400kW Sweden Power                      
  August 2022 Stop valves, control valves & actuator of steamturbine Triveni STST-1060-EB-039 Sweden Power                      
August 2022 Repair of bearings of steam turbine D Siemens Siemens T8440 Netherlands Waste                      
  august 2022 NSC, major overhaul, reverse engineering & production and installation of bearings of steam turbine Siemens SST-110 3037 kW Sweden Power                      
August 2022 Reparation of generator Axel & delivery of spare parts for generator Leroy Somer A56 BMDL145 Sweden Power                      
  August 2022 Adjusting sensors generator system Bently Nevada 3500 Netherlands Industrial                      
August 2022 Check Uniteq Actuator of steam turbine MAN Marc 2 C10 5,72 MW Belgium Biomass                      
  August 2022 Bearing inspection, alignment check & delivery of spare parts for generator Leroy Somer A56 BMDL146 Sweden Power                      
August 2022 Delivery of spare parts for compressor Alstohm Rateau TSD65/65 SXA Suisse Air separation                      
  August 2022 Delivery of clutch for steam turbine ABB STAL VAX HP25 29 200 kW Sweden Paper                      
July 2022 Repair of bearing of Schorch motor 1050 kW 2972 rpm 50Hz 6000v Italy Chemical                      
  July 2022 Delivery of spare parts for steam turbine K202-M1 Netherlands Chemical                      
July 2022 Adjustments on mechanical overspeed device & oil leakkage on steam turbine KKK CF5 GS 1.3MW Sweden Paper & Pulp                      
  July 2022 Inspection of gearbox & major overhaul of steam turbine ALLEN GTA 4.5MW France Sugar                      
July 2022 Control care servo callibration of steam turbine ABB G25A 11MW Spain Sugar                      
  July 2022 Inspection of rotor of Q stork 38 Mw Backpressure France Sugar                      
June 2022 Major overhaul turbo alternator FCB 55CP France Sugar                      
  June 2022 Inspection & repair of generator SKODA 8HY580710/2 17500 kVA Sweden Power                      
June 2022 Delivery of new axial pads for compressor Escher Wyss 90/4A EK Suisse Salt mine                      
  June 2022 Inspection of control valves, gearbox, oil pump & boroscopy of steam turbine Siemens SST-600 OLGA Sweden Power                      
June 2022 Modification turbine control system of steam turbine ABB AEG Kanis G20 9,445 kW Belgium Paper                      
  June 2022 Major overhaul generator GTG-2 30MVA, 10,5kV, 3000rpm, STG 177/200/80 Netherlands Power                      
May 2022 Balancing impellers Pump KSB RDL500 Belgium Power                      
  May 2022 Delivery of bearing sensors for steam turbine Siemens STT300 GE40A 28,3mW Sweden Pulp                      
May 2022 Repair of bearing of steam turbine ABB STAL VAX HP25 29 200kW Sweden Paper                      
May 2022 Delivery of packing for steam turbine KKK Twin CFR5 AFA 6 Belgium Waste                      
May 2022 Bearing inspection of steam turbine Brown Boveri DEF ZI44 26,8Mw Netherlands Waste                      
May 2022 Repair of bearings & couplings of steam turbine Mitsubishi 4mW Seisa HD6050T Spain Power                      
May 2022 Boroscope inspection & vibration measurements of steam turbine MAN MARC -C10 Germany Bio energy                      
  May 2022 Delivery of spare parts for steam compressor Escher Wyss ER 80340 type R28 Suisse Salt mine                      
May 2022 Delivery & Installation of spare parts for steam turbine Blohm & Voss MQAN MARC 2-C01 7,795mW Sweden Waste                      
  May 2022 Helium test steam turbine ABB VE 36A Spain Pulp & Paper                      
May 2022 Non stop check of steam turbine ABB STAL VAX HP25 29200kW Sweden Paper                      
  May 2022 Manufacturing & delivery of bolts, packings, stuffingbox, gaskets, carbonrings for steam turbine Siemens KKK CFR3/AFA6 2,64mW Germany Chemical                      
May 2022 Inspection & repair of bearings of compressor MAN RIK 125-3 Italy Chemical                      
  May 2022 Inspection steam turbine & gearbox MAN MAA 10/MAC 10 8,5mW Spain Power                      
May 2022 Coupling reverse engineering MAN MAA 10/MAC 10 8,5mW Spain Power                      
  May 2022 Inspection of gearbox BHS Voith AD 71 HSO of gasturbine Spain Power                      
May 2022 Service oilpumps, hydraulic valve & LP steam valve of steam turbine ACEC M2209S 6200kW Sweden Chemical                      
  April 2022 Inspection & revision Bellis & Morcom Turbine S,S 0,2237MW Belgium Chemical                      
April 2022 Repair of generator bearing Elin EBG Motoren HTM-180 D04 10913 kVA sweden Power                      
  April 2022 Repair of 2 radial bearings gearset & delivery of 6 new thurst pads MAN MAA10/MAC 10 8,2MW Spain Power                      
April 2022 Delivery & configuration Woodward 8200-1300 505D (LV-std) Steam Turbine MAN Marc2 B00 8,5Mw Spain Power                      
  April 2022 Inspection steam side & troubleshooting stop and regulating valves ALLEN turbine GTA 4,5mW France Food                      
April 2022 Inspection & reparation gearbox of steam turbine ABB AEG KANIS G20 9,445 mW Belgium Paper                      
  April 2022 Repair bearings gearbox RENK TA62 Spain Power                      
April 2022 Touble shooting AEG Kanis GE20 2000kW Sweden Waste                      
  April 2022 Major Overhaul Turboblower PGW GX 420 Greece Waste water                      
April 2022 Major Overhaul & repair bearing of gearbox RENK TA63 Spain Power                      
  April 2022 Support generator alignment + start up Mitsubishi 4mW Seisa HD6050T Spain Power                      
April 2022 Periodic online PD measurements Elin EBG Motoren GmbH Sweden Power                      
  April 2022 Repair of generator bearing Elin EBG Motoren GmbH Sweden Power                      
March 2022 troubleshooting en repair Feed water turbine KKK CF5 GS 1280kW Sweden Paper & Pulp                      
  March 2022 Troubleshooting en repair control system Steam turbine Dresser Rand B5ES-6 2,848 mW sweden Power                      
March 2022 Overhaul Voith Actuator Steam Turbine MAN Marc2 B00 8,5Mw Spain Paper                      
  March 2022 Troubleshooting steam turbine MAN MARC 2 C10 5,72 mW Belgium Biomass                      
March 2022 NSC steam turbine Triveni STST-1060-EB-39 4mW Sweden Power                      
  March 2022 Actuator installation, inspection gearbox, cold alignment & calibration voith actuator MAN MARC2 B00 BHS Cincinnati RTP 56 II Spain Paper                      
February 2022 Reverse Engineering of capital spare parts compressor MAN CO5 RG 40-4 France Chemical                      
  February 2022 Vibration measurement MAN MARC 2 C10 5,72MW Belgium Biomass                      
February 2022 Inspection & refurbishment of gearset MAC VK 90 Demag Main Air compressor France Chemical                      
  February 2022 NSC steam turbine BRNO-CSFR R14-A0 14000kW Sweden Power                      
February 2022 Troubleshooting bearings generator AvK DIG 150k4 4536 kVA Sweden                      
  February 2022 Replacement of pinion stage 1&2 and revision Compressor FGRC-Borsig GK636 Germany Air separation                      
February 2022 Troubleshooting steam turbine Siemens SST 600 24,77 mW Sweden Power                      
  February 2022 Replacement axial bearing steamturbine MAN MARC 2 C10 5,72mW Belgium Biomass                      
December 2021 Major Overhaul + generator + gearbox ABB G25A 11mW Spain Paper                      
  December 2021 Repair of bearings feed water turbine KKK CF5GS 1300kW Sweden Paper &Pulp                      
December 2021 Axial position inspection rotor of steam turbine Fincantieri 36 CE 7280 kW Sweden Power                      
  December 2021 Generator bearing replacement Leroy Somer A56 9100kVA Sweden Power                      
December 2021 Repair Steam turbine & gearset ABB AEG Kanis G20 9,445MW Belgium Paper                      
  December 2021 Bearing repair Fan Fläkt woods Oy KEXrk-85/1580-xx-H-RDO Sweden Biorefinery                      
December 2021 NSC steam turbine KKK Twin CFR5 AFA6 5.385mW Belgium Waste                      
  December 2021 Repair of axial pads Steam turbine MAN MARC 2 H01 8mW Belgium Biomass                      
December 2021 On site inspection of steam turbine Man MARC 2 H01 8mW Belgium Biomass                      
  November 2021 Inpsection & repair of steamcompressor Sulzer Escher Wyss RT 28 ER 80340 Suisse Salt                      
November 2021 Cleaning & adjustment hydraulic trip & control turbine K202-M1 BBC Netherlands Chemical                      
  November 2021 Pressure controle, valves service & callibration + start up Turbine ACEC M2209.S 6,2mW Sweden Chemical                      
November 2021 Minor Overhaul Steam Turbine MAN MARC 2-B00 8,5mW Spain Paper                      
  November 2021 Trouble shooting, major overhaul, repair & start up B&V MARC 2-C01 7,795mW Sweden Waste                      
November 2021 Bearing inspection MAN Sulzer compressor R4K/EP C101/C201 Italy Chemical                      
  November 2021 Inspection of LP Rotor Steam Turbine MAN 31MAA10/31MAC10 50mW Spain Power                      
October 2021 Major Overhaul & repair bearing of gearbox RENK TA63 for Gas Turbine Spain Power                      
  October 2021 Inspection of gearbox & Steam Turbine Siemens 1DR 448-7DE02-Z 22,46 Mw Spain Power                      
October 2021 Inspection & major overhaul Dresser Rand AVT98TW17 4,13MW Belgium Chemical                      
  October 2021 Shaft & bearing inspection, boroscope inspection & start up Steam turbine Man Turbo MARC 2 - H2O 8730 kW Sweden Power                      
October 2021 EMD inspection Steam turbine Elin EBG Motoren HTM-180 D04 10913 kVA Sweden Power                      
  October 2021 Bearing inspection steam turbine & gearbox ABB STAL VAX HP25 29,2MW Sweden Paper                      
October 2021 Bearing inspection & change steam turbine MAN MARC 2H01 8mW Belgium Bio-Mass                      
  October 2021 Axial sensor adjustment Steam turbine PBS R14-A0 14mW Sweden Power                      
October 2021 Troubleshooting Generator control system Steam turbine SC900 MAN Marc 2 C10 Belgium Recycling                      
  September 2021 Repair of bearings high speed shaft diam 280 Steam Turbine MAN MAA/MAC10 8,2MW Spain Power                      
September 2021 Start up Steam turbine MAN MARC 2 B00 8,5 MW Spain Paper                      
  September 2021 Inspection and overhaul of Steam Turbine Dresser Rand AVT98TW17 4,13 mW Belgium Chemical                      
September 2021 Troubleshooting Steam Turbine B+V Marc 2-C01 7,795 mW Sweden Waste                      
  September 2021 Troubleshooting control valve Steam Turbine KKK AFA GT44 GTA 2,3 mW Sweden Paper Mill                      
September 2021 Repair of Turbo Blower PWG GX-420 Greece Waste Water                      
  September 2021 Inspection and repair of Intregally Geared Compressor Demag VK 40-6 Germany Chemical                      
September 2021 Minor overhaul Steam Turbine Siemens SST-600 27,2 mW Sweden Power                      
  August 2021 Delivery & repair of spare parts JOY MAC + JOY TA26M4CRZ/30 Germany Air separation                      
August 2021 Inspection & repair of compressor Escher Wyss 90/4a EK Suisse Salt                      
  August 2021 Yearly maintenance of Steam Turbine Man Marc 2- C10 5,72 mW Belgium Biomass Energy                      
August 2021 Manufacturing and delivery of spare parts Steam Turbine KKK GT5GS 1300 kW Sweden Paper & Pulp                      
  August 2021 Repair of bearings DE/DNE Steam Turbine KKK GF5GS 1300 kW Sweden Paper & Pulp                      
August 2021 NSC and Overhaul of Steam Turbine KKK GF5GS 1300 kW Sweden Paper & Pulp                      
  August 2021 NSC of Steam Turbine AEG Kanis GE20 2 mW Sweden Waste                      
August 2021 Repair of Steam Circulation Compressor Esscher Wyss 90-4A EK Switzerland Salt                      
  August 2021 Manufacturing of bearing turbo-alternator Alstom RV144.87 6000 kVA France Chemical                      
August 2021 Manufacturing of house regulation/stopvalve HP Steam Turbine KKK Twin AFA 46GTS 600 kW Belgium Chemical                      
  July 2021 Major overhaul of Generator AvK Dig 140 k/4 3800 kVA Sweden Power                      
July 2021 Generator inspection EMD Leroy Somer A56 BMDL145 9100 kVA Sweden Power                      
  July 2021 Balancing of impeller pump KSB RDL 500 Belgium Nuclear                      
July 2021 Inspection of rotor Generator Siemens-Schuckert Lj60/2a FT13 13MW Germany Metalurgy                      
  July 2021 Balancing of rotor stage 1 & 2 Atlas Copco Nitrogen Compressor GT050N4K1/GT040N2K2 France Chemical                      
July 2021 Inspection and repair of Turbine BRNO-CSFR R14-A0 14 MW Sweden Power                      
  June 2021 Yearly maintenance of Steam Turbine Man Marc 2-B00 8,5 MW Spain Paper & Pulp                      
May 2021 Reverse engineering of gearset Compressor Atlas Copco GT050N4K1/GT040N2K2 France Chemical                      
  May 2021 Troubleshooting pulsation hydraulic system during start-up Steam Turbine Acec M2209.S 6,2 MW Sweden Chemical                      
May 2021 Inspection of Steam Turbine ABB AEG Kanis G20 9,445 MW Belgium Paper & Pulp                      
  May 2021 Alignment, boroscope inspection of Steam Turbine Man Marc 2 B00 8,5 MW - Cincinnati RTP 56II Spain Paper & Pulp                      
May 2021 Boroscope turbine & gearbox inspection Steam Turbine Siemens SST-600 24,77mW Sweden Paper & Pulp                      
  May 2021 NSC Steam Turbine Man Marc 2-C10 5,72 MW Belgium Biomass Energy                      
May 2021 Reverse Engineering fan KCB Nir 60-40 PKD-DT/VL-VE0009/(010) Belgium Nuclear                      
  May 2021 Inspection of actuators Steam Turbine Siemens SST NG50/40-3 Spain Paper & Pulp                      
May 2021 Overhaul of 2 governors EG10-P Steam Turbine ACEC M2209.S 6,2 MW Sweden Chemical                      
  April 2021 Major overhaul of Steam Turbine ACEC M2209.S 6,2 MW Sweden Chemical                      
April 2021 Inspection and repair of bearings PWG Turboblower GX420 Air Greece Waste Water                      
  April 2021 Delivery of spare parts Steam Turbine Siemens SST-600 24,77 MW Sweden Power                      
April 2021 Rotor replacement and assembly of Compressor FCM Bell E12K Switzerland Salt                      
  April 2021 Delivery of superbolts M48 Compressor Man Nox R56-4N Belgium Chemical                      
April 2021 Major overhaul of Steam Turbine AEG Kanis GE20 2MW Switzerland Waste                      
  March 2021 Revision set of thrustpads Steam Turbine Man MARC 2 H01 8MW Belgium Biomass Energy                      
March 2021 Major overhaul of Compressor unit BLNC LP/HP Siemens Demag VK 40 Germany Air Separation                      
  March 2021 Repair of tilting pad & bull gear bearings N2 Integral Geared Compressor Joy TA24M4CRZ/30 Germany Air Separation                      
March 2021 Delivery of spare parts N2 Integral Geared Compressor Joy TA24M4CRZ/30 Germany Air Separation                      
  March 2021 Repair of oilpump Feed water Turbine KKK CF5GS 1,3 MW Sweden Paper & Pulp                      
March 2021 Delivery of new HP pump Steam Turbine Man Marc 2-B00 8,5 MW Spain Paper & Pulp                      
  March 2021 Repair of cooler pump Steam Turbine Man Marc 2-B00 8,5 MW Spain Paper & Pulp                      
March 2021 Manufacturing, delivery and installment of parts GHH Feedgas & Recycle Compressor FGR 11,5 MW Germany Air Separation                      
  March 2021 Repair of damaged gearset siemens SST300 GE Sweden Paper                      
March 2021 Trouble shooting & repair control system Steam turbine Dresser Rand B5ES-6 2,848 mW Sweden Power                      
  March 2021 Repair of bearings Steam Turbine ABB Stal VAX HP 25 29,2MW Sweden Paper & Pulp                      
March 2021 Delivery of spare parts Steam Turbine ABB Stal VAX HP 25 29,2MW Sweden Paper & Pulp                      
  March 2021 NSC Steam Turbine ABB Stal VAX HP 25 29,2MW Sweden Paper & Pulp                      
March 2021 Repair of radial bearings Steam Turbine MAN MAA10/MAC 10 8,2MW Spain Power                      
  March 2021 Major overhaul and repair of Demag Compressor AR250-7-2 Germany Air Separation                      
February 2021 High speed balancing of rotors pinions Nitrogen Compressor Atlas Copco GT050 N4K1 France Air Separation                      
  February 2021 Reverse Engineering and delivery of coupling Steam Turbine Siemens SST NG 50/40-3 25,0MW Spain Paper & Pulp                      
January 2021 Inspection and repair of Nitrogen Recycle Compressor Joy 2X2 MSG-10RC/1500 Germany Air Separation                      
  January 2021 Major overhaul Steam Turbine Stal Laval DDSM2070 15 MW France Paper & Pulp                      
December 2020 Repair of bearings gearbox Steam Turbine Siemens SST NG 50/40-3 25,0MW Spain Paper & Pulp                      
  December 2020 Repair of rotor Steam Turbine ACEC M2209.S 6,2 MW Sweden Chemical                      
December 2020 Reverse Engineering & Manufacturing of Bullgear bearing Nitrogen Recycle Compressor Joy 2X2 MSG-10RC/1500 Germany Air Separation                      
  December 2020 Minor overhaul and turbine casing repair of Steam Turbine AEG Kanis GE20 2 MW Sweden Waste                      
December 2020 Manufacturing and delivery of spare parts Compressor CO1 Alstohm Rateau TSD65/65 SXA Switzerland Air Separation                      
  December 2020 Overhaul of Compressor Sulzer Escher Wyss 64/5, Gearbox Maag GN19, Steam Turbine Sulzer Escher Wyss NGN560 France Chemical                      
November 2020 Major overhaul of Steam Turbine Siemens SST NG50/40-3 25MW Spain Paper & Pulp                      
  November 2020 Repair of axial bearing gearbox/turbine Steam Turbine MAN MAA10/MAC 10 8,2 MW Spain Power                      
November 2020 Reverse Engineering and Delivery of 3 D models parts Air Compressor Demag CVK 32-3 Italy Air Separation                      
  November 2020 Inspection of Centrifugal Compressor Demag VK90 France Air separation                      
November 2020 Inspection of Air Compressor Demag CVK 32-3 Italy Air separation                      
  October 2020 Inspection and installment of the stuffingboxes Compressor Escher Wyss 90/4a EJ Switzerland Salt                      
October 2020 Manufacturing and delivery of new rotor CO2 Compressor FCM Bell E12K Switzerland Salt                      
  October 2020 Reverse engineering & Manufacturing and delivery of Capital Spare parts Nitrogen Compressor GT050 N4K1 France Air separation                      
October 2020 Cleaning of the steambox and replacement of the carbon rings Steam Turbine SST-060 AFA 46 GTS Twin Spain Paper & Pulp                      
  October 2020 Delivery of clutch turning gear Steam Turbine ABB Stal Vax HP25 29,2 MW Sweden Paper & Pulp                      
October 2020 Major overhaul of Steam Turbine Siemens SST-600 24,77 MW Sweden Power                      
  October 2020 Manufacturing and delivery of complete stuffingbox Compressor Escher Wyss 90/4a EJ Switzerland Salt                      
September 2020 Shaft and bearing repair generator + start-up of Steam Turbine MAN Turbo MARC 2-H02 8,73 MW Sweden Power                      
  September 2020 Replacement of 2 oil pumps Steam Turbine Man Marc 2-B00 8,5 MW Spain Paper & Pulp                      
September 2020 Inspection of Air Compressor Atlas Copco H2H8-4 SP 1480 KW Belgium Chemical                      
  September 2020 Inspection of Steam Turbine KKK Twin - CA 56 5,385 MW Belgium Waste                      
September 2020 Minor overhaul of Steam Turbine MAN Marc 2 H01 8 MW Belgium Biomass Energy                      
  September 2020 Major overhaul of Steam Turbine BRNO-CSFR R14-A0 14 MW Sweden Power                      
September 2020 Manufacturing and delivery of spare parts Steam Turbine ABB Stal Vax HP25 29,2 MW Sweden Paper & Pulp                      
  September 2020 Minor overhaul of Steam Turbine ABB Stal Vax HP25 29,2 MW Sweden Paper & Pulp                      
September 2020 EMD and visual inspection of generator Steam Turbine Siemens SST-110 Twin AFA 46GT6 4,106 MW Sweden Paper & Pulp                      
  September 2020 Inspection of Steam Turbine Siemens SST-110 Twin AFA 46GT6 4,106 MW Sweden Paper & Pulp                      
September 2020 Minor overhaul of Steam Turbine Triventi TST-1060-EB-039 3,896 MW Sweden Power                      
  August 2020 Inspection of Steam Turbine Fincantieri 36 CE 7,28 MW Sweden Power                      
August 2020 Overhaul of 2 governors Steam Turbine Acec M2209. S 6,2 MW Sweden Chemical                      
  August 2020 Reverse Engineering of Cranckcase H2 Compressor Sulzer C2C11CP France Chemical                      
August 2020 Inspection Steam Turbine Siemens SST 110 3MW Sweden Power                      
  August 2020 NSC Steam Turbine Siemens SST 110 3MW Sweden Power                      
August 2020 Overhaul Steam Turbine MAN MAA10/MAC10 8,2 MW Spain Power                      
  August 2020 Minor inspection Steam Turbine MAN Marc 2 C10 5,72MW Belgium Biomass Energy                      
August 2020 Repair actuators Steam Turbine Siemens T8440 The Netherlands Waste                      
  August 2020 Inspection & repair bearings of Feedgas & Recycle Compressor GHH FGR 11,5 MW Germany Air separation                      
July 2020 Overhaul of N2 Integral geared Compressor Joy TA26M4 CRZ/30 Germany Air separation                      
  June 2020 Repair IGV of N2 Intregral geared Compressor Joy TA26M4 CRZ/30 Germany Air separation                      
June 2020 Reverse Engineering of gearset & manufacturing bull gear for Main Air Compressor Joy Germany Air separation                      
  June 2020 Troubleshooting Steam Turbine Acec M2209.S 6,2 MW Sweden Chemical                      
June 2020 Inspection and repair of cylinder and piston Steam Turbine Acec M2209.S 6,2 MW Sweden Chemical                      
  June 2020 Major overhaul Steam turbine KKK CF5GS 1,2 MW Sweden Paper & Pulp                      
June 2020 Delivery & installment of servomotor, check up of control valves and ajustment of axial probes Steam Turbine B+V Marc 2-C01 7,795 MW Sweden Waste                      
  June 2020 Inspection and repair set of bearings Turbine Compressor Escher Wyss 90/4a EK and 90/4aEJ Switzerland Salt                      
May 2020 Troubleshooting/Inspection and repair of Feedgas & Recycle Compressor GHH FGR 11,5 MW Germany air separation                      
  May 2020 Troubleshooting Steam Turbine KKK Twin CA56 5,385 MW Belgium Waste                      
May 2020 Inspection and repair gearbox Steam Turbine Man Turbo Marc 2-H02 8,7 MW Sweden Power                      
  April 2020 Engineering & Visualisation Rotor Dynamics Compressor V450 Belgium Chemical                      
April 2020 Inspection of bearings Compressor Rateau CM2.80.3 France Chemical                      
  April 2020 Repair of turbine casing and rotor Steam Turbine Man Turbo Marc 2 - H02 8730 KW Sweden Power                      
April 2020 Major overhaul of Compressor GHH FGR Germany Chemical                      
  March 2020 Engineering & Visualisation Rotor Dynamics Compressor V860.90 Belgium Chemical                      
March 2020 Inspection and repair of CRF regulating and stop valve Steam Turbine Siemens KKK Twin AFA 46GTS 600 KW Belgium Chemical                      
  March 2020 Inspection of Gas Turbine Rolls Royce Allison 501KB5 3,5 MW The Netherlands Food                      
March 2020 NSC of Steam Turbine B+V Marc 2 - C01 7,795 MW Sweden Waste                      
  March 2020 NSC of Steam Turbine AEG Kanis GE 20 2 MW Sweden Waste                      
March 2020 NSC of Steam Turbine MAN Marc 4 20MW Spain Biomass Energy                      
  March 2020 NSC of Steam Turbine Triveni STST-1060-EB-39 4MW Sweden Power                      
March 2020 Major overhaul of Steam Turbine KKK CF5 GS 1,3 MW Sweden Paper & Pulp                      
  March 2020 Inspection of Compressor MAN NOX V20 Belgium Chemical                      
March 2020 Major overhaul of Compressor Atlas Copco GT021T3 DO/021 T1DO Germany Chemical                      
  March 2020 Troubelshooting control valve Steam Turbine Siemens SST 110 4MW Sweden Paper & Pulp                      
February 2020 Repair of compressor Escher Wyss 90/4a EK Switzerland Salt                      
  February 2020 Manufacturing and delivery of spare parts Compressor Sulzer Escher Wyss 90/4a EJ Switzerland Salt                      
February 2020 Troubleshooting Steam Turbine BBC DEF Zi44 26,8 MW The Netherlands Waste                      
  February 2020 Delivery of Revak series 2 Lubrication oil pump The Netherlands Refinery                      
January 2020 NSC of 2 x feed water turbines KKK CF5GS 1,3 KW Sweden Paper & Pulp                      
  January 2020 Repair of bearings Compressor BHS Cincinnati C202 Italy Chemical                      
January 2020 Delivery of spare parts valve HP side Steam Turbine KKK AFA GT44 GTA 2,3 MW Sweden Paper & Pulp                      
  January 2020 Inspection and repair of Valves HP side Steam Turbine KKK AFA GT44 GTA 2,3 MW Sweden Paper & Pulp                      
January 2020 Manufacturing and delivery of spare parts Steam Turbine ABB ACEC M2209.S 6,2 MW Sweden Chemical                      
  January 2020 Inspection of control valve Steam Turbine ABB ACEC M2209.S 6,2 MW Sweden Chemical                      
January 2020 Revision of Steam Turbine KKK CFR3/AFA6 2,64 MW Germany Chemical                      
  January 2020 Revision Compressor Escher Wyss 90/4a EJ Switzerland Salt                      
January 2020 Troubleshooting control system and inspection of 2 stop valves Steam Turbine Siemens 1DT 448-7DE02-Z 22,465 MW Spain Power                      
December 2019 Troubleshooting Steam Turbine Man Marc 2 8 MW Belgium Biomass Energy                      
December 2019 Manufacturing and delivery of spare part Steam Turbines Stal Laval DDM2070 30 MW and DCDUM2070 22,45 MW Sweden Paper & Pulp                      
  December 2019 Manufacturing and delivery of spare parts Compressor Sulzer Escher Wyss RT28 ER80340 Switzerland Salt                      
November 2019 Inspection of Steam Turbine KKK Twin - CA 56 5,385 MW Belgium Waste                      
  November 2019 NSC of Steam Turbine Dresser Rand SST503-H 1,9 MW Spain Paper & Pulp                      
November 2019 NSC of Steam Turbine Siemens SST NG50/40-3 25MW Spain Paper & Pulp                      
  November 2019 Manufacturing and delivery of spare parts Compressor Alstohm Rateau TSD65/65 SXA Switzerland Air separation                      
November 2019 Manufacturing and delivery of spare parts Steam Turbine ABB STAL TGB8 (HT) TGC8 (LT) 9,538 MW Sweden Power Plant                      
  October 2019 Boroscope inspection Steam Turbine Man MAA10/MAC10 8,2 MW Spain Power                      
October 2019 Inspection of governor valve Steam Turbine Brown Boveri DGF Zi40 14,07 MW The Netherlands Waste                      
  October 2019 Inspection of stop valve Steam Turbine KKK CF5 GS 1,28 MW Sweden Paper & Pulp                      
October 2019 Minor inspection of Steam Compressor ER80340 type RT28 Escher Wyss Switzerland Salt                      
  October 2019 Revision of ventilator CV5300 Belgium Chemical                      
September 2019 EMD and generator inspection Generator ABB HSG710 XS4 Sweden Chemical                      
  September 2019 NSC and revision of Steam Turbine Siemens SST 600 24,77 MW Sweden Power                      
September 2019 Major overhaul Steam Turbine Man DG71/080 22,89 MW Sweden Paper & Pulp                      
  September 2019 Inspection and repair of rotor Steam Turbine Siemens NK40/56/126,5-B1DAS/II Finland Power                      
September 2019 Repair and manufacturing/delivery side plates & Turbine wheel Stal Laval DCDUM2070 22,45MW Sweden Paper & Pulp                      
September 2019 Major overhaul Steam Turbine Stal Laval DCDUM2070 22,45 MW Sweden Paper & Pulp                      
September 2019 Inspection of Steam Turbine Siemens SST 110 TWIN AFA 46GT6 4,106 MW Sweden Paper & Pulp                      
September 2019 Inspection and repair of Steam Turbine Siemens SST 600 - HNK 50/56/112 23,077 MW Sweden Power                      
September 2019 Manufacturing/delivery of coupling Steam Turbine Siemens 1DT 448-7DE02-Z 22,465 MW Spain Power                      
  September 2019 Major overhaul turbo-alternator Thermodyn 821 France Chemical                      
September 2019 NSC Steam turbine ABB/ACEC M2209.S 6,2MW Sweden Chemical                      
  September 2019 Troubleshooting and repair of control valve Steam Turbine Fincantieri 36 CE 7,28 MW Sweden Power                      
September 2019 Inspection of Steam Turbine Ljungstrom 13 MW Germany Metalurgy                      
  September 2019 Major overhaul ABB VE36A Turbine generator set Spain Paper & Pulp                      
August 2019 Electronical check of Gas Turbine Rolls Royce Allison 501KB5 3,5 MW Denmark Power                      
  August 2019 Revision of Thrust pads Steam Turbine Man Marc 2 8 MW Belgium Biomass Energy                      
August 2019 Manufacturing/delivery and repair of spare parts Steam Turbine Man Marc 2 - C10 5,72 MW Belgium Wood                      
July 2019 Inspection gas leakage Gas Turbine Rolls Royce Allison 501KB5 3,5 MW Denmark Power                      
July 2019 NSC and compressor inspection Alstohm Rateau TSD65/65 SXA Switzerland Air separation                      
  July 2019 Boroscope inspection of Steam Turbine Man Marc 2-B00 8,5 MW Spain Pulp & Paper                      
June 2019 Manufacturing and supply of Valve beam Steam Turbine Siemens SST 600 24,77 MW Sweden Power                      
  June 2019 Repair, balancing and assembling of compressor parts Compressor FCM BELL E12K Switzerland Salt                      
May 2019 Alignment of generator Steam Turbine Man Marc 2 8MW Belgium  Biomass Energy                      
May 2019 Vibration analysis gearbox Steam Turbine ABB AEG Kanis G20 Belgium Pulp & Paper                      
May 2019 Bearing exchange Steam Turbine Man Marc 2 8 MW Belgium  Biomass Energy                      
  May 2019 NSC Steam Turbine ABB Stal VAX HP 25 B2528 29,2MW Sweden Pulp & Paper                      
May 2019 Inspection and repair of gearbox Steam Turbine ABB Stal VAX HP25 B2528 29,2 MW Sweden Pulp & Paper                      
  May 2019 Cleaning of Turbo Compressor Rateau CM 2.80-3 France Chemical                      
May 2019 Repair of Gas Turbine Rolls Royce Allison 501KB5 3,5 MW The Netherlands Food                      
  April 2019 NSC Steam Turbine Blohm+Voss AG GR36/35-5 6,24 MW Spain Power                      
April 2019 NSC Steam Turbine Siemens KKK AFA 46 GT5 Twin Spain Power                      
  April 2019 Inspection and repair of Control Valve Steam Turbine Franco Tosi The Netherlands Waste                      
April 2019 Manufacturing of bearing pads Steam Turbine ABB AEG Kanis G20 Belgium Pulp & Paper                      
  April 2019 Installation of electronical overspeed device Steam Turbine Siemens 1DT 448-7DE02-Z 22,47 MW Spain Power                      
April 2019 Major inspection of Steam Turbine Siemens 1DT 448-7DE02-Z 22,47 MW Spain Power                      
  April 2019 Manufacturing of new Turbine rotor Steam Turbine Stal Laval DDM2070 30MW Sweden Pulp & Paper                      
April 2019 NSC Steam Turbine Stal Laval DCDUM2070 22,45 MW Sweden Pulp & Paper                      
  March 2019 Scanning of 2 rotors and bullgear Turbo Compresor Demag VK20 France Chemical                      
March 2019 Hot alignment check Steam Turbine MAN Marc 2 B00 2,0 MW Spain Pulp & Paper                      
  March 2019 Manufacturing , supply of spare parts and Stor Revision of Steam Turbine STAL-LAVAL DDM2070 30MW Sweden Pulp & Paper                      
March 2019 NSC Steam Turbine Siemens SST-600 HNK 50-56-112 27,2 MW Sweden Power                      
  March 2019 Measurement controls Steam Turbine ABB VE36A 8,64 MW Spain Pulp & Paper                      
March 2019 Troubleshooting Steam Turbine G2 Stal DDSV 2072 20 MW Sweden Power                      
  March 2019 Inspection and repair of generator Alsthom RN 144-87 6000 KVA France Chemical                      
March 2019 Inspection rotor generator Steam Turbine Ahlsthom 4,5 MW France Chemical                      
  March 2019 Repair of tilting pads bearings Italy Chemical                      
March 2019 Troubleshooting gas turbine Rolls Royce Allison 501KB5 3,5 MW The Netherlands Food                      
  March 2019 Overhaul of control valve and extraction valves ABB Stal VAX HP 25 B2528 29,2 MW Sweden Pulp & Paper                      
February 2019 Revision of Thrust pads Steam Turbine Man Marc 2 8MW Belgium Biomass Energy                      
  February 2019 Troubelshooting Steam Turbine Man Marc 2 8 MW Belgium Biomass Energy                      
February 2019 Equipment and erection Steam Turbine Siemens SST-300 27,4 MW Sweden Pulp & Paper                      
  February 2019 Inspection of Gas Turbine Rolls Royce Allison 501KB5 3,5 MW The Netherlands Food                      
February 2019 Manufacturing and delivery of spare parts Steam Turbine KKK AFA GT44GTA 2,3 MW Sweden Pulp & Paper                      
  January 2019 Overhaul Control and Extraction Valves Steam Turbine ABB Stal VAX HP 25 B2528 29,2 MW Sweden Pulp & Paper                      
January 2019 Revision of Thrust pads Steam Turbine Man Marc 2 8MW Belgium Biomass Energy                      
  January 2019 Troubleshooting Steam Turbine Man Marc 2 8 MW Belgium Biomass Energy                      
January 2019 Inspection Gas Turbine Rolls Royce Allison 501KB5 3,5 MW The Netherlands Food                      
  January 2019 Manufacturing and supply of spare parts Steam Turbine KKK AFA GT4A GTA 2,3 MW Sweden Pulp & Paper                      
January 2019 Inspection Generator Leroy Somer A56BMDL145 9100 KVA Sweden Power                      
  January 2019 Major overhaul Steam Turbine Fincantieri 36 CE 7,28 MW Sweden Power                      
December 2018 Overhaul Centrifugal Compressor GHH Volko 4 Germany Automotive                      
  December 2018 Commissioning of Woodward governor Steam Turbine SHINKO DNG62B-65 3,715 MW Sweden Power                      
December 2018 NSC Steam Turbine ABB VE36A 8,64 MW Spain Pulp & Paper                      
  December 2018 Safety test Steam Turbine Stal Laval DDV 2070 25 MW Sweden Power                      
December 2018 Major overhaul Steam Turbine Stal Laval DDV2070 25 MW Sweden Power                      
  December 2018 Manufacturing of spare parts and Major overhaul Steam Turbine Stal Laval DDM2070 30 MW Sweden Pulp & Paper                      
December 2018 Major overhaul Steam Turbine Siemens SST-300 27,4 MW Sweden Pulp & Paper                      
  December 2018 NSC Steam Turbine Siemens SST-300 27,4 MW Sweden Pulp & Paper                      
December 2018 NSC Steam Turbine Stal Laval DCDUM 2070 22,45 MW Sweden Pulp & Paper                      
  December 2018 Maintenance of Centrifugal Compressor C095-03000-01 Belgium Chemical                      
December 2018 Maintenance of Centrifugal Compressor Samsung Techwin SE-45N Belgium Chemical                      
  December 2018 Maintenance of Centrifugal Compressor Atlas Copco GT123L4K1 Belgium Chemical                      
December 2018 Rewinding of stator winding SIEMENS generator SGEN 5-100A-4P Sweden Pulp & Paper                      
  November 2018 Repair of set bearings Steam Turbine Brown Boveri DGF 2i 40 14,95 MWA The Netherlands Waste                      
November 2018 Manufacturing and delivery of valve spindle Steam Turbine Siemens ABB Twin Stal HP/LP SST 700 36,6 MW Sweden Power                      
  November 2018 Major overhaul and supply of spare parts Steam Turbine Stal Laval DDM2070 30 MW Sweden Pulp & Paper                      
November 2018 Inspection of Steam Turbine Brown Boveri DGI 500/630 10 MW Norway Pulp & Paper                      
  October 2018 Vibration measurement Steam Turbine MAN Turbo MARC 2-H02 9,33 MW Sweden Power                      
October 2018 Boroscope inspection of Steam Turbine Siemens SST-300 GE 21,54 MW Sweden Pulp & Paper                      
  October 2018 Standard overhaul of hydraulic speed governor KALB Steam Turbine Blohm & Voss Marc 2 - C01 7,795 MW Sweden Waste                      
October 2018 Inspection of Steam Turbine Brown Boveri DGF 2i 40 14,9 MW The Netherlands Waste                      
  October 2018 Inspection and overhaul of speed governor Turbine Sulzer Escher Wyss NGN 560 1,07 MW France Chemical                      
October 2018 Delivery of bolts Steam Turbine Siemens SST-300 27,4 MW Sweden Pulp & Paper                      
  October 2018 Troubleschooting Steam Turbine M+M Mini 0,5 MW The Netherlands Agragian                      
September 2018 Troubleshooting Steam Turbine Man Marc 2-B00 8,5 MW Spain Pulp & Paper                      
September 2018 Repair of bearings Steam Turbine Siemens Siemens SST-600 KNK 50/56/112 23,077 MW Sweden Power                      
September 2018 Supply of valve spindles Steam Turbine Siemens SST-600 KNK 50/56/112 23,077 MW Sweden Power                      
  September 2018 Delivery of studs/nuts/spacer bushes Steam Turbine ABB AEG KANIS G20 Belgium Pulp & Paper                      
September 2018 Repair of active thrust tilting pads Steam Turbine Man Marc 2-B00 2,0 MW Spain Pulp & Paper                      
  September 2018 Delivery of spare parts Steam Turbine Man Marc 2-B00 2,0 MW Spain Pulp & Paper                      
September 2018 Inspection Governor Valve Steam Turbine Franco Tosi 23,45 MW The Netherlands Waste                      
  September 2018 Inspection of Steam Turbine Siemens SST-600 24,77 MW Sweden Power                      
September 2018 NSC and safety check Steam Turbine Siemens SST-300GE 21,154 MW Sweden Pulp & Paper                      
  September 2018 Inspection of compressor flow path HV Turbo KA 10 The Netherlands Waste                      
August 2018 Minor Inspection of Steam Turbine Man Marc 2 C10 5,72 MW Belgium Wood Industry                      
  July 2018 Replacement of Vaup convertor Steam Turbine Siemens SST 110 4,4 MW Sweden Power                      
July 2018 Inspection of Steam Turbine BBC DGF 2i 40 14,95 MW The Netherlands Waste                      
  July 2018 Inspection of stopvalve Steam Turbine ABB AEG KANIS G20 Belgium Paper Plant                      
July 2018 Mechanical inspection excitation Steam Turbine BBC DEG 2i 44 26,8 MW The Netherlands Waste                      
  June 2018 NSC Steam Turbine Siemens SST 600 ENG63/63 49,6 MW Spain Power                      
June 2018 NSC Steam Turbine Siemens SST 400 - CE240 36,6 MW Spain Power                      
  June 2018 delivery of Lube oil pump Steam Turbine Worthington R2R The Netherlands Refinery                      
June 2018 Inspection and repair of coupling and gearbox Steam Turbine Blohm & Voss Marc2-C01 7,795 MV Sweden Waste                      
June 2018 Repair of bearings Compressor Allis Chalmer 262-C-2001 Norway Paper Mill                      
June 2018 NSC Steam Turbine Man Marc 4 C12 21,4 MW Spain Paper Mill                      
June 2018 Inspection of Turbo compressor Sulzer BBC 111-4AEK Switzerland Salt Mine                      
June 2018 Repair of bearings Steam Turbine Siemens SST300 GE 21,154 MW Sweden Paper Mill                      
  June 2018 On site Scanning and 3-D modelling of Nitrogen Compressor GT050 N4K1 France Chemcial                      
June 2018 NSC and inspection of Steam Turbine Babcock Borsig Power M63-G70 9,552 MW Sweden Power                      
  June 2018 Inspection of Steam Turbine Man Marc 2 - 8 MW Belgium Bio Energy                      
June 2018 Delivery and installation of new control system Steam Turbine Siemens SST-110 Twin AFA 46 GT6 - 4,106 MW Sweden Pulp Mill                      
  June 2018 Overhaul of Steam Turbine Siemens SST-110 Twin AFA 46 GT6 - 4,106 MW Sweden Pulp Mill                      
June 2018 Revision of Air Compressor Escher Wyss 90/4a EK Switzerland Salt Mine                      
  June 2018 repair and installment of Gas Regulation Valve Gas Turbine Solar Centaur 3,5 MW Germany Automotive Plant                      
May 2018 NSC Steam Turbine Thyseen Krupp Marc 2B00 4,2 MW Spain Paper Mill                      
May2018 Manufacturing and delivery of interstage seal Turbo Compressor Sulzer BBC 111-4AEK Switzerland Salt Mine                      
May 2018 Adjustment of bracket bearing Steam Turbine Siemens DGF 2i 40 14,95 MW The Netherlands Waste                      
  May 2018 Spare parts check Air Compressor Rateau SM55-45-30 Switzerland Gas Industry                      
May 2018 Inspection of Steam Turbine Man Turbo MARC2-B00/BHS Cincinnati RTP 56 II 8,5 MW Spain Paper Plant                      
  May 2018 Delivery of new sunwheel gearbox Steam Turbine Man Turbo Marc 4-H03 20,02 MW Sweden Power                      
May 2018 NSC Steam Turbine ABB Stal HP25 29,2 MW Sweden Paper Mill                      
April 2018 Inspection and repair of 2 shaft seals Steam Turbine Stal DDM2070 30 MW Sweden Pulp Mill                      
April 2018 Delivery and installation of 2 trip blocs and control blocs + overhaul of Stop Valve and actuators Steamturbine The Netherlands Biorefinery                      
  April 2018 Delivery of speed governor AEG Steam Turbine AEG Kanis GE20 2 MW Sweden Waste                      
March 2018 Supply of converter Steam Turbine Siemens SST 110 4,4 MW Sweden Power                      
  March 2018 Repair of oil leakage extraction valve Steam Turbine Stal Laval DDmM60 10 MW Sweden Paper Mill                      
March 2018 Disassembly and assembly of generator Steam Turbine Stal Laval DDmM60 10 MW Sweden Paper Mill                      
  March 2018 NSC Steam Turbine Siemens 1DT 448-7DE02-Z 22,465 MW Spain Power                      
March 2018 Supply of spare parts Steam Turbine KKK AFAGT4GTA 2,3 MW Sweden Paper Mill                      
  March 2018 NSC Steam Turbine Siemens SST-600 HNK 50/56/112 23,077 MW Sweden Power                      
March 2018 NSC Steam Turbine Shinko DNG62B-65 3,75 MW Sweden Power                      
  March 2018 Supply of 2 sets of bearings Steam Turbine Elliott 2EG-4 France Food Industry                      
March 2018 Inspection of hydraulic actuator Voith Steam Turbine KKK AFAGT4GTA 2,3 MW Sweden Paper Mill                      
  March 2018 Problem solving gearbox Steam Turbine Man Turbo Marc 4-H03 20,02 MW Sweden Power Plant                      
February 2018 Safety test Steam Turbine Stal Laval DDV 2070 20 MW Sweden Power                      
  February 2018 Check of valve Steam Turbine KKK AFAGT4GTA 2,3 MW Sweden Paper Mill                      
February 2018 Repair of bearings Fan Fläkt Wood Oy Sweden Biorefinery                      
  February 2018 Bearing repair Borsing Compressor C202  Italy Chemical Plant                      
January 2018 NSC Steam Turbine Siemens SST 110 4 MW Sweden Pulp Mill                      
  January 2018 NSC Steam Turbine Siemens SST 110 4,4 MW Sweden Power                      
January 2018 NSC and safety checks Steam Turbines AEG Kanis GE 20 2,0 mW and B+V Marc 2-C01 7,795 MW Sweden Waste                      
  January 2018 Inspection HP valve Steam Turbine Alsthom ABB/ACEC 6,2 MW Sweden Chemical Plant                      
January 2018 Check of concentricity and perpendicularity to generator shaft of BHS-Cincinnati RTP 56II Satellite wheel Steam Turbine Man Turbo Marc 2-B00 8,5 MW Spain Paper Plant                      
  January 2018 Repair of collector pump side Stal Laval DDV 2070 25 MW Sweden Power Plant                      
December 2017 Replacement and machining of strips rotor Finland                      
  December 2017 Inspection NDE Bearing Steam Turbine SST 600 25 MW Sweden Power                      
December 2017 Major overhaul of Steam Turbine Stal Laval DDV2072 20MW Sweden Power                      
  December 2017 Turbine & generator revision Steam Turbine Stal Laval DDMM60 B2072 10 MW Sweden Paper Mill                      
December 2017 Major overhaul Steam Turbine Man Turbo Marc 4-H03 20,02 MW Sweden Power                      
  December 2017 Inspection and repair of bearings Air Compressor Booster Italy Chemical Plant                      
December 2017 Isolators/relays tests generator Steam Turbine Man Turbo MARC 2-H02 9,33 MW Sweden Power                      
  November 2017 Delivery of spare parts Steam Turbine Shinko DNG62B-65 3,75 MW Sweden Power                      
November 2017 Minor inspection of Gas Turbine Allison 501 KB5 3,5 MW Denmark Power                      
  November 2017 Minor Inspection of Steam Turbine MAN Marc 2-B00 2,0 MW Spain Paper Mill                      
November 2017 Delivery and installment of parts Steam Turbine ACEC M2209.S 6,2 MW Sweden Chemical Plant                      
  November 2017 EMD measurement generator ABB HSG 710 XS4 Steam Turbine ACEC M2209.S 6,2 MW Sweden Chemical Plant                      
November 2017 Major overhaul Steam Turbine Siemens SST 600 HNK 50/56/112 23,077 MW Sweden Power                      
  November 2017 Changement of the regulating Valve and revision of Voith actuator Steam Turbine Man Marc 2 8 MW Belgium Bio Energy                      
November 2017 Installation of Vibro control 920 Steam Turbine Siemens KKK Twin CA 56 Belgium Waste                      
  November 2017 Inspection and revision of Steam Turbine Siemens KKK Twin CA 56 Belgium Waste                      
October 2017 Inspection of Steam Turbine Fincantieri 36 CE 7,28 MW Sweden Power                      
  October 2017 repair of set of bearings fan Fläkt Wood Oy KEXRK-85/1580-XX-H-RDO
Sweden Bio Refinery                      
October 2017 Engineering & Visualisation Rotor Dynamics Compressor KKK SF0 7,1/9,0 Belgium Chemical Plant                      
  October 2017 Inspection/3D scan/Modelling/balancing of impeller and shaft Sweden Bio Refinery                      
October 2017 Reinstallment of housing Allis Chalmer Compressor R62-C-2001 Norway Paper Mill                      
  October 2017 Inspection and repair of Steam Compressor Escher Wyss ER80340 Type RT 28 Switzerland Salt Mine                      
October 2017 inspection and repair of bearings, delivery of spare parts Steam Turbine Siemens KKK ST-110 AFA6 CFR5 2 MW Belgium Waste                      
  September 2017 Troubleshooting/vibration measurement Steam Turbine ABB AEG Kanis G20 Belgium Paper Plant                      
September 2017 Troubleshooting Steam Turbine Siemens TG 2 9 MW The Netherlands Waste                      
  September 2017 Inspection and repair of bearings Steam Turbine Man Marc 2 8 MW Belgium Bio Energy                      
September 2017 Delivery and installment of new coupling + regulating valve Steam Turbine Siemens SST 600 24,77 MW Sweden Power Plant                      
  September 2017 Major overhaul Steam Turbine Shinko DNG62B-65 3,75 MW Sweden Power                      
August 2017 Delivery of 1 set bearings Elliot Turbine 2EPG4 Modele E France Food Industry                      
  August 2017 Overhaul of Sulzer compressor GHH TKdb 5/5-L Germany Automotive Plant                      
July 2017 Major overhaul generator ELIN EBG typ HTM-180Z04 Steam Turbine Man Turbo Marc 2-H02 9,33 MW Sweden Power plant                      
  July 2017 Bearing De+NDE repair steam turbine Man MARC4-H03 20,02 MW Sweden Power Plant                      
July 2017 Major overhaul Turbine Escher Wyss type NGN50 1,07 MW France Chemical Plant                      
  June 2017 Overhaul Rotor PT4403A coppus RLH Steam turbine The Netherlands Chemical Plant                      
June 2017 Delivery of off set bearing 0 210 mm Gearbox Steam Turbine Siemens SST 300 GE40A 28,3 MW Sweden Pulp Mill                      
  June 2017 Inspection Steam Turbine ABB M2209 S 6,2Mw Sweden Chemical Plant                      
June 2017 Minor inspection steam turbine Siemens SST 600 24,77 Mw Sweden Power Plant                      
  May 2017 Inspection of generator, configuration, delivery and instalment of voltage controller Steam Turbine Siemens SST 110 4,4 Mw Sweden Power Plant                      
May 2017 Manufacturing of retaining rings coupling Belgium Chemical Plant                      
May 2017 Inspection of Turbo compressor Sulzer BBC 111-4AEK Germany Automotive Plant                      
May 2017 Inspection ot steam turbine ABB STAL VAX HP25 29,2 Mw Sweden Paper Mill                      
  May 2017 NSC Steam Turbine Man Turbo Marc4-H03 Sweden Power Plant                      
May 2017 Technical consultancy AE&E 9Mw The Netherlands Waste Plant                      
  May 2017 Supervision AE&E 9Mw Cond.extraction steam turbine The Netherlands Waste Plant                      
May 2017 Delivery of bearing seals generator Siemens SGEN 5-100A-4P Sweden Pulp Mill                      
  May 2017 Intermedium Inspection steam turbine Man Marc 2 8 Mw Belgium Bio Engery                      
April 2017 Gearbox inspection steam turbine Siemens ABB Twin Stal HP/LP SST 700 36,6 Mw Sweden Power Plant                      
  April 2017 NSC steam turbine Fincantieri 36 CE 7,28Mw Sweden Power Plant                      
April 2017 rotor vibration analysis calculation AE&E 9 Mw Cond. Extraction turbine The Netherlands Waste Plant                      
  April 2017 maintenance on rotating equipment compressor Sulzer Escher Wyss 64/5 nr 793 Groupe TC9 France Chemical Plant                      
April 2017 Nsc Steam Turbine Stal DDV2070+DDSV2072 20 :25 MW Sweden Power Plant                      
  April 2017 Reverse engineering Hydraulic units Siemens T8512 EHNG 40/32/40 The Netherlands Bio Chemical plant                      
March 2017 NSC Steam Turbine Siemens SST-110 4 MW Sweden Pulp Mill                      
  March 2017 Delivery of speed pick up Steam Turbine SST-110 4,4 MW Sweden Power                      
March 2017 Adjustment of start system Gas Turbine Solar Centaur 3,5 MW Germany Automotive Plant                      
  March 2017 Inspection and standard overhaul oilpump and repair of bearings Steam Turbine Siemens SST-300 GE40A 28,3 MW Sweden Pulp Mill                      
February 2017 Troubleshooting control system Steam Turbine KKK AFAGTAGTA 2,3 MW Sweden Paper Mill                      
February 2017 NSC Steam Turbine Siemens SST-600 25 MW Sweden Power                      
February 2017 NSC Steam Turbine Siemens SST-300 GE40A 28,3 MW Sweden Pulp Mill                      
February 2017 Repair of shaft seal Steam Turbine KKK AFAGTAGTA 2,3 MW Sweden Paper Mill                      
February 2017 Supply and installment of overspeed device Voith Steam Turbine Siemens SST-110 4,4 MW Sweden Power Plant                      
  February 2017 Supply of drain valves Steam Turbine Siemens SST-300 GE40A 28,3 MW Sweden Pulp Mill                      
February 2017 Troubleshooting AFA Control Valve Steam Turbine Siemens SST-110 4 MW Sweden Pulp Mill                      
  February 2017 Delivery/manufacturing/repair of spare parts Steam Turbine Siemens SST-300GE 21,15 MW Sweden Paper Mill                      
February 2017 Delivery/manufacturing/repair of spare parts Steam Turbine ABB Stal Vax HP25 29,2MW Sweden Paper Mill                      
  January 2017 Troubleshooting Steam Turbine KKK CF5 GS 1,28 MW Sweden Paper Mill                      
January 2017 Exchange of Woodward of Gas Turbine Solar Centaur 3,5 MW Germany Automotive Plant                      
  January 2017 Start-up of Gas Turbine RR Allison KB 5 Netherlands Food Industry                      
November 2016 Inspection of Steam Turbine Siemens SST100 4.4 MW Sweden Power                      
November 2016 Inspection of Sulzer Centrifugal Compressor GHH TKdb 5/5-L Germany Automotive Plant                      
November 2016 Inspection of Steam Turbine Esscher Wyss NG50 1.070 MW France Chemical Plant                      
  November 2016 Repair of impeller Allis Chalmer Compressor 262-C2001 Norway Paper Mill                      
November 2016 Start up of turbine KKK AFA GT44 FTA 2.3 MW Sweden Paper Mill                      
  November 2016 Engineering/manufacturing of spare parts and repair of impeller ABB Flakt Norway Paper Mill                      
November 2016 Inspection of Sulzer compressors Germany Automotive Plant                      
November 2016 Vibration measurement Steam Turbiine Man Turbo Marc2-H02 9.33 MW Sweden Power Plant                      
November 2016 Condition monitoring of Sulzer compressor Norway Paper Mill                      
  November 2016 Changement of bearing and seal Gas Turbine Rolls Royce Allison 501KB5 3.5 MW Netherlands Food Industry                      
November 2016 Start up of turbine Siemens ABB Twin Stal HP/LP SST-700 36.6 MW Sweden Power                      
  November 2016 Inspection Steam Turbine Siemens SST100 KKK/CFR AFA 2MW Belgium Waste                      
November 2016 Revision of Steam Turbine Siemens SST-300/GE40A 28.3 MW Sweden Pulp Mill                      
  November 2016 Engineering/manufacturing of spare parts & repair of rotor Compresor KKK SFO7.1/9.0 Belgium Materials Recycling Plant                      
October 2016 Inspection and repair of Woorward actuator Sweden Chemical Plant                      
  October 2016 Changement of axial bearing Steam Turbine MAN Marc 2 8MW Belgium Bio Energy                      
October 2016 Service on 2 fans Fläkt Wood Oy KEXRK-85/1580-XX-G-H-RDO Sweden Biorefinery                      
  October 2016 Inspection and repair of generator ABB HSG 710XS4 6.2 MW Sweden Chemical Plant                      
October 2016 Engineering/manufacturing of new coupling Compressor Allis Chalmer 262 - C2001 Norway Paper Mill                      
  October 2016 Major overhaul of Steam Turbine KKK AFA GT44 FTA 2.3 MW Sweden Paper Mill                      
August 2016 Major overhaul of Steam Turbine Siemens SST-300GE 21,154 MW Sweden Paper Mill                      
  August 2016 Engineering/manufacturing and installment of new coupling Steam Turbine Man Turbo Marc2 - H02 9.33 MW Sweden Power                      
August 2016 Inspection and repair of bullgear gearbox Steam Turbine Steam Turbine Siemens ABB Twin Stal HP/LP SST 700 36.6MW Sweden Power                      
  August 2016 Engineering/manufacturing of new tilting pads bearing DE Steam Turbine Siemens ABB Twin Stal HP/LP SST 700 36.6MW Sweden Power                      
August 2016 Vibration measurement Steam Turbine Man Marc 2 8MW Belgium Bio Energy                      
  August 2016 Repair of nozzle unit Steam Turbiine AEG Kanis KR32F 15MW Finland Power                      
August 2016 Annual inspection and repair of Gas Turbine Rolls Royce Allison 501KB5 Netherlands Food Industry                      
  August 2016 Start-up of Steam Turbine SST-600 25MW Sweden Power                      
August 2016 Engineering and manufacturing of spare parts Compressor Alhstom TSD65/65 SXA Switzerland Gas Industry                      
  August 2016 Delivery/configuration of vibration protection device + converter Steam Turbine Siemens SST 110 4.4 MW Sweden Power                      
August 2016 vibration measurement and replacement bearings Steam Turbine Man Marc 2 8MW Belgium Bio Energy                      
  August 2016 Engineering/manufacturing of new coupling Steam Turbine Man Turbo MARC 2 -H02 9.33MW Sweden Power Plant                      
July 2016 Troubleshooting Steam Turbine Siemens SST110 4,4 MW Sweden Power                      
  July 2016 Troubleshooting Steam Turbine Man Marc 2 8MW Belgium Bio Energy                      
July 2016 Inspection leakage DE turbine bearing Steam Turbine Siemens SST-600 HNK 50/56 25.4 MW Sweden Power                      
  July 2016 Inspection and revision Compressor parts Blower KKK- SFO7-1/9.0 Belgium Materials Recycling Plant                      
July 2016 inspection of Compressor parts Allis Chalmer 262 - C2001 Norway Paper Mill                      
  July 2016 repair of turbine parts + installation on site Steam Turbine Stal DMM2070 12MW Sweden Chemical Plant                      
June 2016 Troubleshooting Steam Turbine Man Turbo MARC 2-H02 9,33 MW Sweden Power                      
  June 2016 NSC + major overhaul Steam Turbine ABB Stal Vax HP25 B2528 29,2 MW Sweden Paper Mill                      
June 2016 Exchange of a Gas Turbine Solar Centaur 3,5 MW Germany Automotive                      
  June 2016 Installation of delivered parts Steam Turbine SST 600 T6374 24,77MW Sweden Power                      
June 2016 Inspection of gearbox LP and HP Steam Turbine Siemens ABB Twin Stal HP/LP Sweden Power                      
  June 2016 repair of bearings Compressor 90/4a EK Switzerland Salt Mine                      
Mai 2016 Troubleshooting Steam Turbine Siemens SST100 KKK/CFR AFA 2 MW Belgium Waste                      
  Mai 2016 Inspection of compressor Alstohm Rateau TSD65/65 SXA Switzerland Gas Industry                      
Mai 2016 Bearing inspection of Steam Turbine Shinko DNG 62B-65 3,65MW Sweden Power                      
  Mai 2016 NSC Steam Turbine KKK AFAGT4GTA 2,3 MW Sweden Paper Mill                      
Mai 2016 Upgrade Turbine Controls Gas Turbine Solar Centaur 3,5 MW Germany Automotive                      
  Mai 2016 Re-coating compressor part of Gas Turbine Allison 501KB5 3,5 MW Denmark Power                      
Mai 2016 Installation of overhauled Centrifugal Compressor Siemens Demag VK32-3EX Russia Chemical Plant                      
  April 2016 Assistance activity on Steam Turbine GE-Turbodyne 40MW Netherlands Power                      
April 2016 Vibration measurement Steam Turbine Man Turbo MARC2-H02 9,33 MW Sweden Power                      
  April 2016 NSC Steam Turbine Siemens SST 600 - HNK 50/56 25,35 MW Sweden Power                      
April 2016 NSC Steam Turbine Siemens SST 110 4MW Sweden Pulp Mill                      
  April 2016 Inspection and oil leakage repair Steam Turbine Stal DDM2070 30 MW Sweden Pulp Mill                      
April 2016 Delivery of parts Steam Turbine Siemens SST 600 25MW Sweden Power                      
  April 2016 Troubleshooting Gas Turbine Allison Controls KB501 3,5 MW Netherlands Paper Mill                      
April 2016 Inspection of split line Steam Turbine Stal Laval DDV 2070 25 MW Sweden Power Plant                      
  April 2016 NSC Steam Turbine Shinko DNG 62B-65 3,65 MW Sweden Power                      
April 2016 Leaktest condensor Steam Turbine Skoda G6 KP-40-6,1 40MW Sweden Pulp Mill                      
  March 2016 Minor overhaul of Steam Turbine ABB AEG Kanis G20 Belgium Paper Plant                      
March 2016 Inspection of Blower Hoffman 75.103.B Belgium Steel Plant                      
  February 2016 Troubleshooting Woodward & regulating properties Steam Turbine Nadrowski 1,7 MW Sweden Power                      
February 2016 Inpection of bearings & impeller Air Compressor KKK SFO 7,1/9,1 Belgium Reclycing Plant                      
  February 2016 Overhaul of Centrifugal Compressor Siemens Demag VK32-3EX Russia Chemical Plant                      
January 2016 Troubleshooting Allias Chalmers Compressor 262-C2001 Norway Päper Mill                      
  January 2016 Annual 8000h inspection Gas Turbine Rolls Royce Allison 501KB5 3,5 MW Denmark Power                      
January 2016 Investigation vibrations Steam Turbine Blohm & Voss Marc 2-C01 7,795 MW Sweden Waste Plant                      
January 2016 Alignment and bearing inspection Steam Turbine Siemens ABB Twin Stal HP/LP SST700 36,6 MW Sweden Power Plant                      
January 2016 Re-assembly and installment of GHH Main Air Compressor TD 4,5/5 BAR Italy Chemical Plant                      
  January 2016 Replacement of valve spindles Steam Turbine Siemens SST600 25 MW Sweden Power                      
December 2015 Reverse engineering and manufacturing of spare parts Steam Turbines Siemens KKK CF5DS/KKK AF8GS/G250/2 Sweden Refinery                      
  December 2015 Rotor cleaning and HSB rotor Steam Turbine Siemens ABB Twin Stal HP/LP SST700 36,6 MW Sweden Power Plant                      
December 2015 Inspection of Steam Turbine AEG Kanis GE50A(K) 9,05 MW Netherlands Carbon Industry                      
  December 2015 Replacement of damaged silencer panels inlet sound sound silencer G200 Turbocompressor Germany Waste plant                      
December 2015 Boroscope inspection Gas Turbine Rolls Royce Allison 501KB5 3,5 MW Netherlands Food Industry                      
  December 2015 Inspection & repair of rotor Centrifugal Compressor Elliot K601 Sweden Refinery                      
November 2015 NSC Steam Turbine KKK Siemens CFR3/AFA6 GT6 2,64 MW Germany Chemical Plant                      
  November 2015 Inspection of gearbox and installment of new oil pump Steam Turbine Siemens SST300 GE40A 28,3MW Sweden Pulp Mill                      
November 2015 Repair of components GHH Main Air Compressor TD 4,5/5 BAR Italy Chemical Plant                      
  November 2015 Shaft seal repair Steam Turbine Stal DDSV 2072 20 MW Sweden Power                      
November 2015 Overhaul of Turbine Compressor Brown Boveri - Sulzer type 90/4a EK Switzerland Salt Plant                      
  October 2015 Inspection of Steam Turbine GEM DGSS28P 6,5 MW France Chemical Plant                      
October 2015 Overhaul of anti surge valve Sulzer Turbo Compressor ER80340 type RT28 Switzerland Salt Plant                      
  October 2015 Overhaul of Sulzer Turbo Compressor ER80340 type RT28 Switzerland Salt Plant                      
October 2015 Installment of new Control Valves Steam Turbine Alstohm Netherlands Waste                      
October 2015 Reverse engineering and manufacturing of Control Valves Alstohm Steam Turbine Netherlands Waste                      
October 2015 Diagnosis & intervention on the controls of Steam Turbine Financieri 2 MW Italy Power                      
October 2015 Bearing repair HP16 of Steam Turbine Siemens ABB Twin Stal 36,6 MW Sweden Power                      
October 2015 Inspection of Compressor ABB/Western C2001 Norway Paper Mill                      
  October 2015 Troubleshooting oil leakage Gas Turbine RR Allison KB501 3,5 MW Netherlands Paper Mill                      
September 2015 Manufacturing and delivery of parts Sulzer Steam Compressor ER80340 RT28 Switzerland  Salt Plant                      
  September 2015 Major inspection turbine control system Steam Turbine SST 110 4MW Sweden Pulp Mill                      
September 2015 Bearing split line inspection/repair Steam Turbine Stal DDM 2070 30 MW Sweden Pulp Mill                      
  September 2015 Repair of rotor and impeller Air Compressor KKK SFO 7,1/9,0 Belgium Reclycing Plant                      
September 2015 Assembly of control valve and servo Steam Turbine Siemens SST100 4 MW Sweden Pulp Mill                      
  September 2015 Inspection of KKK Compressor SFMG 5,6A Sweden Paper Mill                      
September 2015 Repair of servo Steam Turbine SST 600 25 MW Sweden Power                      
September 2015 Assembly of Steam turbine SST 100 4 MW Sweden Pulp Mill                      
September 2015 Commissioning and assistance Steam Turbine Alsthom type TM2 24,5/48,5 9,2 MW France Waste                      
  September 2015 Installment of new dampers Inlet Sound Silecer turbo compressor G200 Germany Waste                      
September 2015 Rotor repair Sulzer RC-4A-4N-81 France Paper Plant                      
  September 2015 Inspection and repair of valve beam Steam Turbine SST 600 25 MW Sweden Power                      
September 2015 Bearing inspection Steam Turbine SST 600 NK63/3,2 36,5 MW Netherlands Biomass                      
August 2015 Delivery of new gear Steam Turbine Siemens SST 100 4MW Sweden Pulp Mill                      
August 2015 Start-up and functionality check control Steam Turbine SST 600 25 MW Sweden Power                      
  August 2015 Major overhaul Steam Turbine Alstohm type TM2 24,5/48,5 9,2 MW France Waste                      
August 2015 Yearly inspection Gas Turbine RR Allison 501 K 3 MW + testing of generator protection relays Denmark Power                      
  August 2015 Demagnetisation and high speed balancing of turbine rotor Steam Turbine Alstohm typ TM2 24,5/48,5 9,2 MW France Waste                      
August 2015 Disassembly of old Compressor and Installment of Turbo Compressor Brown Boveri/Sulzer 90/4A EK Switzerland Salt Plant                      
  August 2015 Machining of labyrinths Turbo Compressor Brown Boveri/Sulzer 90/4A EK Switzerland Salt Plant                      
July 2015 Bearing inspection Steam Turbine Peter Brotherhood Frame 20 10,75 MW Spain Power                      
  July 2015 Bearing inspection Steam Turbine MAN Marc 2-BOO 2,5 MW Spain Paper Mill                      
July 2015 Inspection and repair of actuator Woodward PDG 29 France Food Industry                      
  July 2015 Supply of 2 sets of bearings Steam Turbine Elliott 2EG-4 France Food Industry                      
July 2015 Inspection of Compressor IR Germany Automotive                      
  July 2015 Bearing inspection Steam Turbine HP and LP Siemens ABB Twin Stal HP/LP SST700 36,6 MW Sweden Power                      
July 2015 Inspection of Main Air compressor unit GHH TKD 4,5/5 Bar Italy Chemical Plant                      
  July 2015 Inspection of rotor Sulzer RC-4A-4N-81 France Paper Plant                      
July 2015 Inspection of 2 rotors Compressor ABB/WESTERN C20001 Norway Paper Mill                      
  July 2015 Inspection of Steam Turbine Stal Laval G1 B-2073 12MW Sweden Pulp Mill                      
July 2015 Upgrade of Turbo Compressor Brown Boveri/Sulzer 90/4A EK Switzerland Salt plant                      
  July 2015 Standard overhaul of Centrifugal compressor + replacement of coupling GHH TK 5/2 + TG 5/3 Germany University                      
July 2015 Major overhaul Steam Turbine Alsthom type TM2 24,5/48,5 9,2 MW France Waste                      
  July 2015 Inspection of B&V turbine MAN 1505 Kw 15,650 rpm France Chemical Plant                      
June 2015 Axial bearing check and bump test of rotor Steam Turbine Alsthom ABB/ACEC 6,2 MW Netherlands Chemcial Plant                      
  June 2015 Inspection and replacement of damaged panels in Inlet Sound Silencer Turbocompressor G200 Germany Waste Plant                      
June 2015 Inspection Thrust Bearing Chloor Compressor Siemens Netherlands Chemical Plant                      
  June 2015 Sandblasting and inspection of rotor Steam Turbine Escherwyss RG 800 France Chemical Plant                      
June 2015 Inspection and repair of stopvalve Steam Turbine Shinko DNG 62-+65 3,65MW Sweden Power                      
  June 2015 Delivery of new spindle for ESV Valve Steam Turbine Shinko DNG 62B-65 3,65MW Sweden Power                      
June 2015 Major overhaul of Steam Turbine Shinko DNG 62B-65 3,65 MW Sweden Power                      
  June 2015 Major overhaul of Steam Turbine MARC 2-B00 OMAA10 8,5MW Spain Paper Plant                      
Mai 2015 Inspection of Steam Turbine Blohm & Voss Marc 2 - C01 7,795 MW Sweden Waste                      
  Mai 2015 Start-up of Centrifugal Compressor Rateau SM55-1 France Chemical Plant                      
April 2015 Inspection of Steam Turbine Esscherwyss typ RG800 France Chemical Plant                      
  April 2015 Supply of set of oil labyrinth seals and complete bearing house of Steam Turbine Blohm & Voss KR50/70-2 4,4 MW Germany Waste                      
April 2015 Inspection of gearbox Gas Turbine Allison KB501 3,5 MW Netherlands Paper Mill                      
  April 2015 Inspection and overhaul of 3 Turbo Air Blowers Sulzer RC4-3N-80/RC4A-4N-80/RT56-1 Norway Paper Mill                      
April 2015 Overhaul of Kalb speed governor Sweden Waste                      
  April 2015 On site Installment of rotor Centrifugal Compressor Rateau SM55-1 France Chemical Plant                      
April 2015 Inspection and testing of convertor VOITH 3/3 Sweden Paper Mill                      
  April 2015 Delivery and installation of supports pedestal generator bearing no 1 of steamturbine GEMCO DGSS28P 6,5 MW France Chemical Plant                      
March 2015 Inspection/repair of rotor centrifugal compressor Rateau SM55-1 France Chemical Plant                      
  March 2015 Supply of valve spindle Steam Turbine Siemens SST800 - 89,785 MW Sweden Power Plant                      
March 2015 Supply of HMI for turbine control systems Steam Turbine AEG Kanis 11,2 MW Netherlands Carbon Industry                      
  March 2015 Visual inspection of impeller Centrifugal Compressor GHH TK 5/2 + TG5/3 Germany University                      
March 2015 NSC Steamturbine Alsthom type TM2 24,5/48,5 9,2 MW France Waste Plant                      
  March 2015 Engineering surge valve study Steam Compressor Sulzer RT28 ER80340 Switzerland Salt plant                      
March 2015 Overhaul of 3 x Steam Turbine Dresser Coppus TF16 Sweden Refinery                      
  March 2015 Overhaul of Steam Turbine Siemens G200/2 1,848 MW Sweden Refinery                      
March 2015 Overhaul of Steam Turbine Siemens G250/2 1,78 MW Sweden Refinery                      
  March 2015 Overhaul of Steam Turbine KKK AF8Gs 0,605 MW Sweden Refinery                      
March 2015 Overhaul of Steam Turbine KKK CF5Ds 0,625 MW Sweden Refinery                      
  March 2015 Manufacturing and delivery of HT Bypass valve Steam Turbine Siemens SST800 89,785 MW Sweden Power                      
February 2015 Maintenance inspection Centrifugal Compressor Atlas Copco GT-032 L6K1 Italy Chemcial Plant                      
  February 2015 Inspection of rotor Blower KKK AF SL9a Italy Chemical Plant                      
February 2015 Troubleshooting Steam Turbine Stal DDSV2072 20 MW Sweden Power                      
  February 2015 Repair of rotor, bearings and seals Chlorine Gas Compressor Demag GD425 Sweden Chemical Plant                      
January 2015 Delivery gaskets Steam Turbine Stal DM65 17,3 MW Sweden Biorefinery                      
  January 2015 Delivery and installment of spare parts Gas Turbine Allison KB 501 3,5 MW Netherlands Paper Mill                      
January 2015 Check of generator Steam Turbine Siemens SST300GE 25 MW Sweden Pulp Mill                      
  January 2015 Cleaning of stream strainer Steam Turbine Stal Laval DDTM2070 18,11 MW Sweden Pulp/Paper Mill                      
January 2015 NSC Steam Turbine Siemens ABB Twin Stal HP/LP SST700 36,6 MW Sweden Power                      
  January 2015 NSC Steam Turbine Nadrowski B5S - 5+6 1,6 MW Sweden Power                      
January 2015 NSC Steam Turbine Stal DDSV 2072 20 MW Sweden Power                      
January 2015 NSC Steam Turbine KKK AFAGT4GTA 2,3 MW Sweden Paper Mill                      
January 2015 NSC Steam Turbine Siemens SST600 HNK 50/56 25,4 MW Sweden Power                      
  January 2015 NSC Steam Turbine Dresser Rand Nadrowski 20878 G5DD+G 1,7 MW Sweden Power                      
January 2015 NSC Steam Turbine AEG Kanis GE 20 2MW Sweden Waste                      
  January 2015 NSC Steam Turbine Man Marc 2-H01 7MW Sweden Power                      
January 2015 NSC Steam Turbine Siemens VA25-ATP1 11,85 MW Sweden Power Plant                      
  December 2014 Revision and white metal coating of trust bearings Air Compressor KKK type SFO 9 Belgium Reclycing Plant                      
December 2014 Repair of off-set bearings Steam Turbine Siemens ABB Twin Stal HP/LP SST 700 Sweden Power                      
  December 2014 Delivery of spare parts Gas Turbine Rolls Royce Allison 501 K 3,0 MW Denmark Power                      
December 2014 Inspection of steam Turbine Stal DM 65 17,3 MW Sweden Biorefinery                      
  December 2014 Major overhaul Steam Turbine KKK Siemens CFR3/AFA6 GT6 2,64 MW Germany Chemcial Plant                      
December 2014 Vibration measurements Centrifugal Air Compressor GHH TK 5/2 + TG5/3 Germany Technical University                      
  December 2014 Nozzle inspection Steam Turbine Alsthom TM290 4,4MW France Waste                      
November 2014 NSC Steam Turbine MAN MARC 2 2,0 MW Spain Paper Mill                      
  November 2014 NSC Steam Turbine ABB G32 Siemens 12MW Portugal Sugar Mill                      
November 2014 Inspection and replacement of carbon rings Turbo Compressor Sulzer-Escher Wyss RT28-1 Italy Chemical Waste                      
  November 2014 Inspection and overhaul of Steam Turbine Stal DDM2070 30 MW Sweden Pulp Mill                      
November 2014 EMD Measurements on 2 Asea HS generators Steam Turbine Stal DDM2070 30 MW Sweden Pulp Mill                      
November 2014 Major overhaul Steam Turbine Siemens SST300GE 25 MW Sweden Pulp Mill                      
November 2014 NSC Steam Turbine Skoda R14 AO 14 MW Sweden Power                      
November 2014 NSC Steam Turbine Siemens SST800 72 MW Sweden Paper Mill                      
November 2014 Bearing inspection HP Steam Turbine Siemens ABB Twin Stal SST700 36,6MW Sweden Power                      
  November 2014 Troubleshooting axial displacement Steam Turbine AEG Kanis GE20 2MW Sweden Waste                      
October 2014 Delivery of an Electro-Hydraulic Actuator control Woodward CPC2 The Netherlands Activated carbon plant                      
  October 2014 Start-up of Steam Turbine Stal DDSV 2072 - 20MW Sweden Power                      
October 2014 Troubleshooting Steam Turbine Siemens KKK AF6 G6a 3,0 MW Sweden Power                      
  October 2014 Start-up of Steam Turbine Siemens SST 600 25 MW Sweden Power                      
October 2014 NSC Steam Turbine Siemens KKK CFR3/AFA6 GTA 2,64 MW Germany Chemical Plant                      
  October 2014 NSC Centrifugal Compressors Atlas Copco GT032 L6K1 K101 and K102 Italy Chemical Plant                      
October 2014 Various repairs Steam Turbine Siemens SST 300 GE40A 28,3 MW Sweden Pulp Mill                      
October 2014 Troubleshooting Gearbox of Steam Turbine Siemens SST 300GE 25 MW Sweden Paper Mill                      
October 2014 Troubleshooting Steam Turbine Stal DDM2070 30MW Sweden Pulp Mill                      
  October 2014 Start-up & calibration of GHH Turboverdichter Centrifugal Compressor 5, Volko 5 Germany Automotive plant                      
October 2014 Revision of actuator GHH Turboverdichter compr 5, Volko 5 Germany Automotive plant                      
  October 2014 Minor overhaul Steam Turbine Blohm & Voss Marc 2 - C01 7,795 MW Sweden Waste plant                      
October 2014 NSC Steam Turbine Siemens SST 300 GE40A 28,3MW Sweden Waste                      
October 2014 NSC Steam Turbine Blohm+Voss Marc 2 - C01 7,795 MW Sweden Waste                      
September 2014 Non stop check SteamTurbine Blohm & Voss KR45/80-2 3,43 MW Germany Biomass                      
  September 2014 Assistance minor overhaul steamturbine Siemens SST600 NK 63/32 36,5 MW The Netherlands Biomass                      
September 2014 Minor overhaul of steamturbine Siemens KKK AFA 6 G6a 3MW Sweden Power                      
  September 2014 Inspection of steamturbine Tuthill Nadrowski C5DSII + TSG2-355 1,712 MW Sweden Power                      
September 2014 Seal inspection steamturbine Stal Laval DDSV 2072 18,82 MW Sweden Power                      
  September 2014 Major overhaul steamturbine GTA Dresser Rand Nadrowski B5S4 2,7 MW France Waste plant                      
September 2014 Replacement of valve seat steamturbine STT 600 NK40/56 24.8 MW Sweden Power                      
  September 2014 Repair of a Worthington R2R steam turbine process pump driver The Netherlands Refinery                      
September 2014 On site balancing electr motor / compressor Sulzer K 203 Italy Lead Recycle plant                      
  September 2014 Minor overhaul steamturbine KKK AF6 3 MW Sweden Power plant                      
August 2014 Major overhaul on Siemens backpressure steamturbine NG50/40-3 25MW Spain Paper mill                      
  August 2014 Bearing inspection turbine Blohm & Vos Marc 4 - H04 15,9 MW Sweden Power                      
August 2014 Troubleshooting on a Siemens NKS 40/63-3 20.7 MW steam turbine Denmark Power plant                      
  August 2014 Non stop check Tuthill Nadrowski C5DSII + TSG2-335 1.7 MW Sweden Power plant                      
August 2014 Hot alignment check Siemens ABB Twin Stal steam turbine LP/HP 16 VAX Sweden Power plant                      
  August 2014 Inspection of 2 TAIKO Blowers RG - 350 W France Waste plant                      
August 2014 Supply and installation of 2 new spindles for regulation valve Siemens NG50/40-3 18MW Spain Paper mill                      
  July 2014 Cleaning of LP nozzle & impeller KKK AFA4 G3A Tandem steam turbine Germany Waste plant                      
July 2014 Troubleshooting Dresser Rand 12D8878 1.4 MW steam turbine Spain Paper mill                      
  July 2014 Main stopvalve inspection Siemens ABB Twin Stal turbine LP/HP 16 VAX Sweden Power plant                      
July 2014 Bearing inspection Blohm & Voss Marc 4-HO4 15,9 MW steam turbine Sweden Power plant                      
  July 2014 Revision GHH Turboverdichter compr 4, Volko 4 nr 120396 Germany Automotive plant                      
June 2014 Yearly inspection RR Allison 501 KB5 gasturbine Denmark Power plant                      
  June 2014 Inspection Atlas Copco GT032 L6K1 steam blower italy Chemical plant                      
Mai 2014 Inspection/repair of rotor centrifugal compressor RATEAU SM55-1 C2716 France Chemical plant                      
  Mai 2014 Performance evaluation on 2 steamturbines Fincantieri 36 TE 3MW / 60 TE 2,6 Mw Italy Biomass plant                      
Mai 2014 Bearing inspection gearbox Siemens STT600 25.4 MW Sweden Power plant                      
  Mai 2014 Installment new vibration measurement system SHINKO turbine DNG62B-65 3.65MW Sweden Power plant                      
Mai 2014 Inspection stop valve SHINKO turbine DNG62B-65 3.65MW Sweden Power plant                      
  April 2014 Boroscope inspection/control valve inspection Siemens STT 600 NK40/56 24.8MW Sweden Power plant                      
April 2014 Upgrade control valve Siemens STT 600 NK40/56 24.8MW Sweden Power plant                      
  April 2014 Troubleshooting control oil system Siemens STT300 GE40A 28.0MW Sweden Pulp mill                      
April 2014 Bearing inspection AEG Kanis Type G steam turbine 11.2MW The Netherlands Activated carbon plant                      
  April 2014 Delivery and installment of spare parts Siemens STT100 CA35GT6 Germany Power plant                      
April 2014 Inspection steam compressor Sulzer Escher Wyss RT28-1 Italy Chemical Waste plant                      
  April 2014 Overhaul compressor Alstohm 55-45-30 Switzerland Industrial gas                      
April 2014 High speed balancing of a rotor Blohm&Voss KR 50/70-2 4.4MW turbine Germany Waste plant                      
  March 2014 Overhaul of a Brown Boveri 90/4A EK compressor Switzerland Salt mine                      
March 2014 Seal upgrade and design modification Siemens ACEC 10MW HP Sweden Chemical plant                      
  March 2014 NSC /inspection/bearing repair on a Siemens ABB Twin Stal turbine HP/LP Sweden Power plant                      
March 2014 Supervising overhaul of a Atlas Copco compressor GT032T2K1 Sweden Chemical plant                      
  March 2014 Vibration analysis Turbine ABB G20 10MW Belgium Paper mill                      
March 2014 Troubleshooting control valve Stal DM65 17,3 MW Sweden Paper mill                      
  February 2014 Generator/overspeed and vibration repair Indar BZKL/710/V-4 7100 KVA - 1500/1800RPM Sweden Power plant                      
February 2014 NSC SHINKO turbine DNG62B-65 3.65 MW Sweden Power plant                      
  February 2014 Inspection valve Steam Turbine Dresser Rand Nadrowski B5S-5 3,4 MW Norway Waste plant                      
January 2014 Installation vibrocontrol Siemens STT100 CA35GTA 30MW Germany Power plant                      
  January 2014 Inspection generator Indar BZKL/710/V-4 7100KVA - 1500/1800RPM Norway Waste plant                      
January 2014 Overhaul Worthington R2R The Netherlands Refinery                      
  January 2014 Supply of Revak II bearing lubrication system The Netherlands Refinery                      
January 2014 Inspection Siemens SST600 NK40/56 25MW Sweden Power plant                      
  December 2013 Installation iginitors on a Allison 501K Gas Turbine Denmark Power plant                      
December 2013 Troubleshooting on a Siemens SST100 CA35GTA 30MW Germany Power plant                      
  December 2013 Inspection of Demag axial & GHH Bull Gear compressor and low balancing rotor Germany University                      
December 2013 Troubleshooting and replacement of a control valve spindle Siemens SST-600 25 Mw Sweden Power plant                      
  December 2013 Inspection and cleaning intake filter Steam Turbine Alsthom Rateau Soget typ 9100 CP 43 9 MW France Chemical plant                      
November 2013 Intervention Steam Turbine Alsthom Rateau Soget typ 9100 CP43 9MW France Chemical plant                      
  November 2013 Alignement check Blohm&Voss steam turbine MAN Sweden Power plant                      
November 2013 Assisting a gearbox installation Blohm&Voss Marc 4 H-04 15 Mw Sweden Power plant                      
  October 2013 Balancing of a rotor steam turbine Worthington R2R The Netherlands Refinary                      
October 2013 Delivery of parts and assembly of turbocompressor Sulzer Esser Wyss RT28 Switzerland Power plant                      
October 2013 Overhaul of steamturbine KKK AFA4 G3a Siemens Germany Recycling plant                      
October 2013 Inspection of rotor and upper casing Blohm&Voss KR40/50-2 2,7MW Germany Waste plant                      
  October 2013 Inspection of gearbox and steamturbine AEG Kanis Siemens 13 MW Netherlands Activated carbon plant                      
October 2013 Major overhaul and rotor interstage seal repair of a Siemens STT-300 28Mw turbine Sweden Paper Mill                      
  October 2013 Installation of shaft seals Stal DM65 17,2 MW Siemens Sweden Bio refinery                      
September 2013 Delivery and installation of turbine starter for a Allison KB501 gas turbine RR The Netherlands Paper mill                      
  September 2013 Minor overhaul Steam Turbine Tuthill Nadrowski Dresser-Rand B7ES-4 3MW France Waste plant                      
September 2013 Inspection Turbo Compressor Brown Boveri - Escher Wyss 90/4a EK Switzerland Salt mine                      
  September 2013 Major overhaul of a STAL DDM 2070 30 Mw steam turbine Sweden Pulp mill                      
September 2013 Configuration turbine Tuthill Nadrowski Dresser Rand B5S4 2,7 MW France Waste plant                      
  September 2013 Inspection C2001 compressor Sulzer Norway Bio refinery                      
September 2013 Intervention Allison KB501 gasturbine RR The Netherlands Food Industry                      
  August 2013 Inspection Woodward governor and actuator of a 1-stage Worthington The Netherlands Refinery                      
August 2013 Delivery reconditioned governor valve assembly for Terry 24 ZSA-1 steam turbine Germany Refinery                      
  August 2013 Delivery and installation combustion liners Allison 501KB gasturbine RR Denmark Power plant                      
August 2013 Inspection Taiko (BP/HP) pump France Metallurgic industry                      
  August 2013 Installation of electronic speed pickup Siemens SST-600 25MW Sweden Power plant                      
August 2013 Supervision during steam systems tests ABB/ACEC 6,2MW turbine Siemens Sweden Chemical plant                      
July 2013 Minor overhaul of ABB VAX 24MW tandem turbine Siemens Sweden Power plant                      
July 2013 Inspection and repair of control valves Siemens ABB VA25-ATP 11MW Sweden Power plant                      
July 2013 Repair and installing of new valve parts for Blohm+Voss Marc 4-H04 15,9 MW turbine Sweden Power plant                      
July 2013 Inspection Elliot 2EPG4-Model E steamturbine France Chemical plant                      
  July 2013 Installation new nozzles GTA Alsthom TM2 4 MW France Waste plant                      
July 2013 Inspection turbine control system AEG Kanis steamturbine Siemens The Netherlands Activated carbon plant                      
  July 2013 Repair Centrax KB5 gasturbine package The Netherlands Food industry                      
June 2013 Major inspection of generator Blohm+Voss Marc 4 (Alsthom ) Sweden Power plant                      
  June 2013 Inspection and delivery of spare parts to a Siemens SST-600 25 MW Siemens Sweden Power plant                      
June 2013 Electrical equipment check Siemens SST-110 4 MW Twin turbine Sweden Paper mill                      
  June 2013 Safety test of a Blohm+Voss Marc 4 Sweden Power plant                      
June 2013 Annual inspection Allison 501 KB gasturbine RR Denmark Power plant                      
June 2013 Inspection Alsthom Rateau steamturbine France Chemical plant                      
June 2013 Repair work of STAL DM65 1956 turbine incl. turbine wheel Siemens Sweden Bio refinery                      
  Mai 2013 Service of a Voith bull gear compressor Sweden Chemical plant                      
Mai 2013 Boroscope inspection Allison KB5 gasturbine RR The Netherlands Paper mill                      
  Mai 2013 Intervention AEG Kanis steamturbine Siemens The Netherlands Activated carbon plant                      
Mai 2013 Minor overhaul Tuthill Nadrowski Dresser rand France Waste plant                      
Mai 2013 Intervention and measuring nozzles GTA TM2 Alsthom France Waste plant                      
Mai 2013 Start up KKK CF4G steamturbine Siemens France Chemical plant                      
  Mai 2013 Delivery and installation combustion liners Allison 501KB gasturbine RR Denmark Power plant                      
  April 2013 Safety & Functionality tests Siemens SST-600 25 MW Sweden Power plant                      
  April 2013 Intermediate inspection Siemens STT 600 The Netherlands Biomass                      
  April 2013 Inspection and repair of KKK CF4G steam turbine Siemens France Chemical plant                      
  April 2013 Minor overhaul Nadrowski turbo-generator Dresser Rand France Waste plant                      
  April 2013 Repair work of a AEG-Kanis GE20 2MW turbine Siemens Sweden Waste plant                      
  March 2013 Repair work of a ABB/ACEC 6,2 MW turbine Siemens Sweden Chemical plant                      
  March 2013 20000 hrs overhaul of a Siemens STT 110 + delivery spare parts Siemens Germany Power plant                      
  March 2013 NSC of a Siemens STT 110 Siemens Germany Power plant                      
  March 2013 Overhaul DEMAG VK10 compressor Siemens Germany Chemical plant                      
  March 2013 Intermediate inspection Centrax KB5 gasturbine package RR Netherlands Food industry                      
  March 2013 Delivery complete new controls system Siemens steamturbine TP 2002A Denmark Power plant                      
  March 2013 Overhaul Siemens Hydraulic Trip Block HB96611-002A Denmark Power plant                      
  March 2013 NSC of a Siemens SST-300 28 MW turbine Sweden Paper mill                      
  March 2013 NSC of a Siemens VA25-ATP1 11 MW Sweden Power plant                      
  March 2013 NSC of a ABB / ACEC 6,2 MW turbine Siemens Sweden Chemical plant                      
  February 2013 NSC of a AEG-Kanis 2MW turbine and Blohm+Voss 9 MW turbine Sweden Waste plant                      
  February 2013 Delivery spare parts for KKK CF4G Siemens France Chemical plant                      
  February 2013 Activities on Mitsubishi gas turbine MF111B Italy Paper mill                      
  January 2013 Safety & Functionality tests Siemens SST-600 36 MW The Netherlands Biomass                      
  January 2013 Delivery Spare parts + intervention Coppus RLHA24 Steam turbine Germany Pharmaceutical Plant                      
  January 2013 8000 hrs inspection Allison 501 KB gasturbine RR Denmark Power plant                      
  January 2013 Rotor inspectation Clark 3MX 5/03 K1241 Italy Chemical plant                      
  Januraty 2013 Trouble shooting and repair work of STAL DM65 Siemens Sweden Chemical plant                      
  December 2012 Revamp and control upgrade of KKK CF4G Siemens France Chemical plant                      
  November 2012 Feasibility study Maintenance cycle SST 600 Siemens 36 Mw The Netherlands Biomass                      
  October 2012 Intervention Dresser Rand Tuthill Nadrowski 2,7 Mw typ B5S4 control & Island mode France Incineration                      
  October 2012 Overhaul ABB Fläkt Turbo HAXRG 80/1938 Norway Paper mill                      
  September 2012 Overhaul of STAL DM65 17250 Kw Siemens Sweden Chem/Power plant                      
  August 2012 Overhaul of turbo compressor BBC/Sulzer Typ VWR 565 Swiss Salt factory.                      
  August 2012 Overhaul of integral geared Radial turbo compressor Gec Alsthom C01 typ SM55-45-30 Swiss Air separation                      
  July 2012 Safety test of a Blohm+Voss Marc 4-HO4 15,9 MW Sweden Power plant                      
  July 2012 Major overhaul Siemens SST 060 2,5 Mw. Sweden Chemical plant.                      
  July 2012 Revision and adaption oil system Worthingthon R2R The Netherlands Refinery                      
  July 2012 Exchange of Solar Taurus 60 Gas Turbine , Turbomach package. Germany Pharma industry                      
  July 2012 Exchange of Solar GT Gas Turbine , Turbomach package. Germany Power                      
  June 2012 Major Inspection turbine Siemens SST 600. 25 Mw. Sweden Power                      
  June 2012 Disassembly of Gas Turbine Solar Taurus 7301, Turbomach package. Germany Power plant                      
  Mai 2012 Inspection of steam turbine Acec 13 Mw.Condense turbine Siemens Belgium Chemical plant                      
  Mai 2012 Overhaul of KKK BF4/50 Steam Turbine Siemens Germany Chemical plant                      
  Mai 2012 Overhaul of Turbocompressor Alsthom Rateau C01 Switzerland Air separation industry                      
  Mai 2012 Inspection of STAL DM65 Siemens Sweden Chemical plant                      
  Mai 2012 Inspection of generator 501 Centrax Turbine Denmark Power plant                      
  Mai 2012 Inspection of 2 Stal Turbines DDM2070/DCDUM2070 Siemens Sweden Power                      
  Mai 2012 Repair of 2 x pumps Taiko + 2 x compr. Kwangshin France Chemical plant                      
  Mai 2012 Overhaul SST 600 Siemens turbine . 25 Mw. Sweden Power                      
  April 2012 Overhaul of turbocompressor SULZER BBC 90/4a EK Switzerland Salt plant                      
  March 2012 Minor overhaul of KKK 4.243 MW SST 110 Twin Steam Turbine Sweden Paper plant                      
  March 2012 Overhaul of Steam Turbine KKK-K5B and boiler feed pump Siemens Sweden Power                      
  March 2012 Check of satefy functionalities of a Blohm & Voss 9 Mw. Steam Turbine Sweden Power plant                      
  March 2012 Inspection of bearings GHH Verdichter Germany Automotive                      
  March 2012 Overhaul KKK AF 3.5G Steam turbine Siemens Germany Chemical                      
  March 2012 First Inspection Siemens KKK AF4/G6A 1.6 turbine Siemens Germany Paper mill                      
  March 2012 Inspection Ingersoll-Rand Centac C80MXS UK Power plant                      
  March 2012 Overhaul Rest gas-turbine M.A.N. 5280 GTG 6/80 Germany Chemical                      
  March 2012 Inspection of gearbox Rolls Royce Allison 501KB5 The Netherlands Paper Mill                      
  March 2012 Troubleshooting gas turbine Rolls Royce Allison 501KB5 Denmark Incineration                      
  March 2012 Inspection of SST 600 25 MW Siemens turbine Sweden Incineration                      
  March 2012 Overhaul boiler feed pump Worthington 3UYD10 France Automotive                      
  February 2012 Inspection of gas turbine Solar Taurus 5 Mw.,Turbomach package. Germany Automotive                      
  January 2012 Major overhaul of steam turbine & generator set CEM typ DG SS28p/6500 kW France Chemical Plant                      
  January 2012 Major overhaul of Alsthom steam turbine Soget type 9100CP43 and generator– 9 MW France Chemical Plant                      
  December 2011 Troubleshooting & service of AEG Kanis G16 1 MW steam turbine Siemens Germany Food Industry                      
  December 2011 Overhaul of turbo compressor BBC Turbo 111-4AEK Sulzer Switzerland Chemical Plant                      
  December 2011 Inspection of integrally geared centrifugal compressor Alsthom SM55-45 Switzerland Chemical Plant                      
  November 2011 Major overhaul of integral geared compressor Demag VK 10 Siemens Germany Chemical Plant                      
  November 2011 Overhaul of multistage steam turbine AEG Kanis G16 3,5 MW Siemens Germany Food Industry                      
  November 2011 Inspection of inline centrifugal compressor Clarj 4M9-6 & 2M10-8 3,6 MW – 2,9 MW Serbia Chemical Plant                      
  October 2011 Troubleshooting & service of BBC 3 MW back-pressure steam turbine generator Belgium Chemical Plant                      
  October 2011 Installation of steam turbine controls & hydraulic system upgrade 10 MW AEG The Netherlands Chemical Plant                      
  September 2011 Inspection of gas turbine Solar Taurus 60 control system 5 MW Belgium Paper Mill                      
  September 2011 Inspection RWT Gearbox of 2 MW Dresser Rand steam turbine Belgium Chemical Plant                      
  August 2011 Troubleshooting Chlorine turbo compressor PGW Siemens The Netherlands Chemical/Salt Plant                      
  August 2011 Major overhaul of 10 MW AEG steam turbine,generator, partial re-blading of rotor The Netherlands Chemical Plant                      
  July 2011 Overhaul of turbo compressor comp 4, Volko 4 nr 4530 Germany Automotive                      
  July 2011 Overhaul & repair IGV of integral geared Radial turbo compressor Alsthom C01 Switzerland Air Separation                      
  June 2011 Overhaul of 2 turbo compressors BBC/Sulzer Typ VWR 565 Switzerland Salt Factory                      
  Mai 2011 Major overhaul of a Peter Brotherhood steam turbine 5175 kW Sweden Biomass                      
  Arpil 2011 Major overhaul of Atlas Copco integral geared Air compressor HLR 8 – 3.8 Belgium Air Separation                      
  March 2011 Repair of a Worthington S2SHA turbine rotor France Automotive                      
  January 2011 Supply & installation of new hot gas section of Rolls Royce Allison 501KB5 The Netherlands Paper Mill                      
  October 2010 Overhaul multistage centrifugal Pump Worthington 3UYD 10-11 SS France Automotive                      
  October 2010 Overhaul of 3 stages centrifugal compressor Dresser Rand 1M3 428 kW Hungary Refinery                      
  September 2010 Overhaul 6 stages centrifugal compressor Dresser Rand 2M10-6 MSC 3300 kW Hungary Refinery                      
  September 2010 Repair of 7 stages centrifugal compressor Elliott 38M9I S/N L8060R1 10652 HP Hungary Refinery                      
  August 2010 Overhaul of gas expander MAN Turbo E56-3V 8345 kW Czech Republic Chemical Plant                      
  August 2010 Overhaul of centrifugal turbo compressor MAN Turbo RIK 100-5 410 kW Czech Republic Chemical Plant